Bidder Selection Plan

Bidding packages for repairing generator unit No. 1 of Vung Ang 1 Thermal Power Plant in 2026 are included in Appendix 1 of Decision 872/QD-DLDK dated September 30, 2025

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 16:01 03/12/2025
Contractor Selection Plan ID
PL2500322868-00
Publishing time
15:33 03/12/2025
Posting Status
Published
Contractor selection plan name
Bidding packages for repairing generator unit No. 1 of Vung Ang 1 Thermal Power Plant in 2026 are included in Appendix 1 of Decision 872/QD-DLDK dated September 30, 2025
Procurement name
Rehabilitate unit 1 of Vung Ang 1 Thermal Power Plant in 2026
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Shopping budget
To view full information, please Login or Register
Spending Category
Mandatory spending
Authority that issues the decision
CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC DẦU KHÍ VIỆT NAM - CÔNG TY CỔ PHẦN - TRUNG TÂM DỊCH VỤ KỸ THUẬT
Approval date
26/11/2025
Approval ID
791/QĐ-TSC
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 12
1.Tender package No 25: Procurement of condenser washing materials, turbine auxiliary system for overhauling unit 1 of Vung Ang 1 Thermal Power Plant in 2026
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Is different
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Procurement of condenser cleaning supplies and turbine auxiliary systems for overhauling unit 1 of Vung Ang 1 Thermal Power Plant in 2026
Capital source details
Production and business of the Corporation
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
2.Tender package No 26: Providing repair services for steam valves of the turbine system and valves of the turbine auxiliary equipment system - generator unit 1 of Vung Ang 1 thermal power plant in 2026
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Is different
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing repair services for Steam Valves of the Turbine system and Valves of the Turbine - Generator auxiliary equipment system of Unit 1 of Vung Ang 1 Thermal Power Plant in 2026
Capital source details
Production and business of the Corporation
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
3.Tender package No 27: Providing repair services for the smoke and wind system of generator unit No. 1 of Vung Ang 1 Thermal Power Plant in 2026
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Is different
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing repair services for the smoke and wind system of generator unit No. 1 of Vung Ang 1 Thermal Power Plant in 2026
Capital source details
Production and business of the Corporation
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
4.Tender package No 28: Providing repair services for the hydraulic coupling system of water pump for unit No. 1 of Vung Ang 1 Thermal Power Plant in 2026
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Is different
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing repair services for the water pump hydraulic coupling system for unit No. 1 of Vung Ang 1 Thermal Power Plant in 2026
Capital source details
production and business of the company
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
5.Tender package No 29: Providing repair services for 220kV station system, self-using generator unit No. 1 of Vung Ang 1 Thermal Power Plant in 2026
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Is different
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing 220kV station system repair service, self-using generator unit No. 1 of Vung Ang 1 Thermal Power Plant in 2026
Capital source details
Production and business of the Corporation
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
6.Tender package No 30: Providing a full service package (including experts, labor, machinery, tools) for testing generator stator coils, group 1
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Is different
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing a full package of services (including experts, labor, machinery, tools) for testing generator stator coils, group 1, including: AC leakage current testing, Delta tangent testing, PD partial discharge testing, Preparation of evaluation report.
Capital source details
Production and business of the Corporation
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
7.Tender package No 31: Providing experts to service the Turbine - Generator System of Unit 1 of Vung Ang 1 Thermal Power Plant in 2026
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Is different
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing experts to service the Turbine - Generator System of Unit 1 of Vung Ang 1 Thermal Power Plant in 2026
Capital source details
Production and business of the Corporation
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
8.Tender package No 32: Providing labor, VTTH, VLP, MTC to serve the overhaul of the Turbine - Generator system, Turbine auxiliary system of Unit 1 of Vung Ang 1 Thermal Power Plant in 2026
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Is different
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing labor, VTTH, VLP, MTC to serve the overhaul of the Turbine - Generator system, Turbine auxiliary system of Unit 1 of Vung Ang 1 Thermal Power Plant in 2026
Capital source details
Production and business of the Corporation
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
Is different
Prequalification
No
Implementation location (After merge)
9.Tender package No 33: Hire supply pump experts and turbine drive experts to service the supply pump system and condenser pump of unit 1 of Vung Ang 1 Thermal Power Plant in 2026
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Is different
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Hire supply pump experts and turbine drive experts to service the supply pump system and condenser pump of unit 1 of Vung Ang 1 Thermal Power Plant in 2026
Capital source details
Production and business of the Corporation
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
10.Tender package No 34: Providing 10kV motor BDSC services, condensate water pump system, cooling water pump system - Unit No. 1 - Vung Ang 1 Thermal Power Plant in 2026
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Is different
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing 10kV motor BDSC services, condensate water pump system, cooling water pump system - Unit No. 1 - Vung Ang 1 Thermal Power Plant in 2026
Capital source details
Production and business of the Corporation
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
11.Tender package No 35: Supply of labor, VTTH, VLP, MTC to service the repair of the condensate pump system, supply water, turbine driving the supply pump, main cooling water pump to serve the repair of the supply water/condensate/main cooling water system of generator unit No. 1 of Vung Ang Thermal Power Plant 1 in 2026
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Is different
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing labor, VTTH, VLP, MTC to service the system repair of condensate pump system, supply water, supply pump drive turbine, main cooling water pump to serve the repair of main supply water/condensate/cooling water system of generator unit No. 1 of Vung Ang 1 Thermal Power Plant in 2026
Capital source details
Production and business of the Corporation
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
Is different
Prequalification
No
Implementation location (After merge)
12.Tender package No 36: Providing labor, VTTH, VLP, MTC to service C&I equipment repair of Turbine - Generator system, main steam valves, auxiliary Turbine - Generator, condensate water system, supply water, main cooling water of generator unit No. 1 of Vung Ang 1 Thermal Power Plant in 2026
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Is different
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing labor, VTTH, VLP, MTC to service C&I equipment repair of Turbine - Generator system, main and auxiliary steam valves of Turbine - Generator, condensate water system, supply water, main cooling water of generator unit No. 1 of Vung Ang 1 Thermal Power Plant in 2026
Capital source details
Production and business of the Corporation
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
Is different
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Bidding packages for repairing generator unit No. 1 of Vung Ang 1 Thermal Power Plant in 2026 are included in Appendix 1 of Decision 872/QD-DLDK dated September 30, 2025". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Bidding packages for repairing generator unit No. 1 of Vung Ang 1 Thermal Power Plant in 2026 are included in Appendix 1 of Decision 872/QD-DLDK dated September 30, 2025" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 6

You did not use the site, Click here to remain logged. Timeout: 60 second