Bidder Selection Plan

Blood bank construction project

  Watching      
Find: 13:59 20/09/2025
Contractor Selection Plan ID
PL2500226665-00
Publishing time
13:58 20/09/2025
Posting Status
Published
Contractor selection plan name
Blood bank construction project
Investment objective
Building infrastructure and equipment of blood banks meeting European GMP standards to receive and prepare blood supply and blood products to serve the whole Ho Chi Minh City and some hospitals in neighboring provinces; At the same time, investing in blood banks projects to meet good facilities and equipment to serve well for the development of the development and emergency training center for advanced technical research, technical training training on blood -related techniques.
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500048753-00
Name of project
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
4 Years
Authority that issues the decision
Ban Quản lý dự án đầu tư xây dựng các công trình dân dụng và công nghiệp Thành phố Hồ Chí Minh
Approval date
16/09/2025
Approval ID
835/QĐ-DDCN
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Highest bid price, Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 3
1.Consulting on making Bidding Documents and evaluating Bid Bids package 2
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Evaluation of Bidding Documents, Bid Evaluation of Bidding Package Consulting construction drawing and cost estimates and advice on making project information model (BIM)
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
September 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
2.Consulting construction drawing and cost estimates; Prepare work information model (BIM)
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Designing and designing construction drawings and total estimates and supervision of the author; Consulting on creating a project information model (BIM)
Capital source details
city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
September 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
3.Consultancy and verification of construction drawing design and cost estimate
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verify the appropriateness of design solutions; Compliance with regulations on management cost estimate.
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
September 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Blood bank construction project". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Blood bank construction project" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 15

You did not use the site, Click here to remain logged. Timeout: 60 second