Bidder Selection Plan

Building Lam Cot Secondary School

  Watching  
Project Contractor selection plan Bid award
Find: 11:04 14/02/2025
Contractor Selection Plan ID
PL2500023171-00
Publishing time
11:04 14/02/2025
Posting Status
Published
Contractor selection plan name
Building Lam Cot Secondary School
Bid Solicitor
Name of project
Building Lam Cot Secondary School
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Other
Authority that issues the decision
TRƯỜNG THCS LAM CỐT
Approval date
14/01/2025
Approval ID
14/QĐ- THCS
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Building Lam Cot Secondary School
Tender/ Prequalification Notice ID
Contract execution period
3 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Uncategoried
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
New construction of KT garage (49.0*5.2) m. Steel frame structure (column, truss) galvanized steel pipe is 1.4mm thick; The beam includes 1.4mm galvanized steel box; 10mm thick steel column legs; KT column foundation (70*70*80) cm concrete in 200, stone 2*4; Link the column with the 4M16*160*160 bolt foundation (550-600); 0.4mm oil joint venture corrugated iron roof; Arranging steel frame against shade trees of galvanized steel box 40*80*1.4mm. Linking steel frame with shade tree is steel belt. Arranging anti -dump frame for 12 shade trees.
Capital source details
Source of tuition and socialization of facilities
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
January, 2025
Type of contract
All in One
Implementation location
Tân Yên District, Province Bắc Giang
Implementation location (After merge)
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Building Lam Cot Secondary School". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Building Lam Cot Secondary School" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 7

You did not use the site, Click here to remain logged. Timeout: 60 second