Bidder Selection Plan

Building sewer system, sidewalks from Km63 bridge to the bow

  Watching      
Find: 09:51 26/03/2025
Contractor Selection Plan ID
PL2500059045-00
Publishing time
09:50 26/03/2025
Posting Status
Published
Contractor selection plan name
Building sewer system, sidewalks from Km63 bridge to the bow
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500014658-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
3 Years
Authority that issues the decision
Ủy ban nhân dân huyện Chợ Lách
Approval date
25/03/2025
Approval ID
1133/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 6
1.Make a lake Sister invites tender and Evaluate application file contractor
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Make EHSMT, fight Price E-HSDT Bidding package install, perform function, duties of bid solicitor
Capital source details
Echo book home water
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Chợ Lách District, Vĩnh Long
Implementation location (Before merge)
Ben Tre Province
2.Advise judge determined HSMT and ending choice choose home package bid construction contractor install
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Appraisal HSMT and conclusion choice result package contractor construction contractor
Capital source details
Echo book home water
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Chợ Lách District, Vĩnh Long
Implementation location (Before merge)
Ben Tre Province
3.Advise monitor construction build
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Exam supervision construction work build
Capital source details
Echo book home water
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Chợ Lách District, Vĩnh Long
Implementation location (Before merge)
Ben Tre Province
4.Advise check experience collect
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Perform public inspection experience collect and give credit submitted to history use
Capital source details
Echo book home water
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Chợ Lách District, Vĩnh Long
Implementation location (Before merge)
Ben Tre Province
5.Tell dangerous
Tender/ Prequalification Notice ID
Contract execution period
515 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Insurance all risks build
Capital source details
Echo book home water
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Chợ Lách District, Vĩnh Long
Implementation location (Before merge)
Ben Tre Province
6.Civil Works
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Building system clear drainage Ø80cm, seams 2.0m wide summer brick Tezarro (40x40) cm. Sum long line sewer Water 1,520m.
Capital source details
Echo book home water
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Chợ Lách District, Vĩnh Long
Implementation location (Before merge)
Ben Tre Province

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Building sewer system, sidewalks from Km63 bridge to the bow". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Building sewer system, sidewalks from Km63 bridge to the bow" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 14

You did not use the site, Click here to remain logged. Timeout: 60 second