Bidder Selection Plan

Civil engineering in the preparation stage for investment project Construction of a road from ring road 3.5 to connecting road from Hoang Quoc Viet road extending to Nam Thang Long Industrial Park

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
This Contractors Selection Plan data is found on both the old and new Public Procurement systems. The data you are viewing is updated from the new Public Procurement system
Find: 15:40 21/05/2022
Contractor Selection Plan ID
20220554027-00
Publishing time
15:35 21/05/2022
Posting Status
Published
Contractor selection plan name
Civil engineering in the preparation stage for investment project Construction of a road from ring road 3.5 to connecting road from Hoang Quoc Viet road extending to Nam Thang Long Industrial Park
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Spending Category
Investment and Development Spending
Location
Authority that issues the decision
N/A
Approval date
10/03/2022
Approval ID
Số 615/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Package 07: Consulting to change the border on the map in 1994, determine the area to be recovered, prepare the application for notification of the area, prepare the technical documents for the land plot, document the works on the land, and set up landmarks to paint the works in the field. clearance service
Tender/ Prequalification Notice ID
Contract execution period
500 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Capital source details
city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q2 2022
Type of contract
All in One
Prequalification
No
Location

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Civil engineering in the preparation stage for investment project Construction of a road from ring road 3.5 to connecting road from Hoang Quoc Viet road extending to Nam Thang Long Industrial Park". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Civil engineering in the preparation stage for investment project Construction of a road from ring road 3.5 to connecting road from Hoang Quoc Viet road extending to Nam Thang Long Industrial Park" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 16

You did not use the site, Click here to remain logged. Timeout: 60 second