Bidder Selection Plan

Complete construction inside and outside internal road area

  Watching      
Find: 16:44 11/10/2024
Contractor Selection Plan ID
PL2400229746-00
Publishing time
16:42 11/10/2024
Posting Status
Published
Contractor selection plan name
Complete construction inside and outside internal road area
Investment objective
Phase 1 (until 2024): - Complete basic construction - Deploying the installation of infrastructure equipment on the 3rd floor of FPT Telecom District 9 Data Center according to Tier3 standards - Estimated number of racks: 476 racks
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2300047543-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group A
Project implementation time
2 Years
Authority that issues the decision
CÔNG TY CỔ PHẦN CÔNG NGHỆ VIỄN THÔNG FPT
Approval date
11/10/2024
Approval ID
004/XD/DCQ9-MEP-GĐ1/QĐ-FCN
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Complete construction inside and outside internal road area
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Construction of the steel structure system supporting the raised floor system in the corridor area of ​​the 3rd Floor (330 m2) within 60 (sixty) days from the date of signing the Contract and receiving the Notice of commencement from the Investor; - Waterproofing the 3rd Floor corridor and inside DC Hall; - Defect (treatment of grinding, filling, etc.) on concrete floor surfaces of machine rooms with raised floors installed with self-leveling mortar; - Construction and waterproofing of rooftop machinery platforms and oil tank platforms; - Construction of oil tank containment wall (1st time); - Construction of technical gene box, pedestal for placing oil tank for generator room; - Construction of covering existing floor openings on Floors 1 and 2; - Cleaning the 4th, 5th, 6th, 7th Floors, DC roof and covering the doorways on the 4th, 5th, 6th, 7th Floors with fireproof plaster (including box steel frame); - Clean the bottom of manholes to collect rainwater; - Dismantling the old stone concrete layer, constructing the machine base and waterproofing the restaurant roof area; - Complete Harderner construction (exposing stone) on the floor of the 1st floor of the DC building and the floor of the 1st floor of the dining room; - Install plaster ceiling (sunk frame) in bathroom area on Floors 1, 2, 3; - Complete construction of Epoxy paint for generator room area and DC house transformer station; - Construction of 1.0 meter high stairs and installation of iron railings for the generator room and transformer station on the 3rd floor of the DC building; - Complete 02 water paint to cover the entire structure of Floors 1, 2, 3, 8 (Floors 1, 2, 3 except the main lobby area) and stairs; - Complete construction of the internal and external road yard area: construction of curbs and road base; - Construction of garden landscape (remaining positions not yet constructed) including providing planting land and trees as required in the outside internal yard areas and on the rooftop of the DC building; - Industrial cleaning of DC buildings from Floors 1, 2, 3 including vacuuming, cleaning on raised floors, under raised floors, on top of racks; cleaning the glass wall system of the dining room and DC house; Cleaning the 1st and 2nd floors, restaurant roof and areas surrounding the building.
Capital source details
Bank loan/investment capital for business development
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
Fixed unit price
Implementation location
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Complete construction inside and outside internal road area". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Complete construction inside and outside internal road area" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 27

You did not use the site, Click here to remain logged. Timeout: 60 second