Bidder Selection Plan

Completing the fire protection system of the centralized wastewater treatment plant in Hiep Phuoc Industrial Park, phase 1

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 14:03 07/09/2023
Contractor Selection Plan ID
PL2300160024-00
Publishing time
14:02 07/09/2023
Posting Status
Published
Contractor selection plan name
Completing the fire protection system of the centralized wastewater treatment plant in Hiep Phuoc Industrial Park, phase 1
Name of project
Completing the fire protection system of the centralized wastewater treatment plant in Hiep Phuoc Industrial Park, phase 1
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Other
Authority that issues the decision
Hội đồng Quản trị Công ty Cổ phần Khu công nghiệp Hiệp Phước
Approval date
05/09/2023
Approval ID
27/2023/NQ-HIPC-HĐQT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 4
1.TV3 bidding package: Audit consulting
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Corporate capital and loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
All in One
Prequalification
No
Location
2.Tender package TV1: Preparation of bidding documents and evaluation of bids for mixed bidding packages
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Corporate capital and loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2023
Type of contract
All in One
Prequalification
No
Location
3.Tender package TV2: Construction supervision consultancy and equipment installation
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Corporate capital and loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location
4.Mixed bidding package: Construction, equipment inspection and completion of procedures for invitation for acceptance of fire prevention and fighting
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Uncategoried
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Corporate capital and loan capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Completing the fire protection system of the centralized wastewater treatment plant in Hiep Phuoc Industrial Park, phase 1". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Completing the fire protection system of the centralized wastewater treatment plant in Hiep Phuoc Industrial Park, phase 1" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 8

Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8549 Projects are waiting for contractors
  • 417 Tender notices posted in the last 24 hours
  • 431 Contractor selection plan posted in the last 24 hours
  • 24859 Tender notices posted in the past month
  • 38646 Contractor selection plan posted in the last month
Consultants are supporting you
You are not logged in.
To view information, please Login or Register if you do not have an account.
Signing up is simple and completely free.
You did not use the site, Click here to remain logged. Timeout: 60 second