Bidder Selection Plan

Component project 2: Construction of Lien Mac focal works cluster, Bac Tu Liem district, Hanoi city (phase 1)

  Watching      
Find: 10:41 04/11/2025
Contractor Selection Plan ID
PL2500277775-01
Publishing time
10:40 04/11/2025
Posting Status
Published
Contractor selection plan name
Component project 2: Construction of Lien Mac focal works cluster, Bac Tu Liem district, Hanoi city (phase 1)
Investment objective
Taking water from the Red River into the Nhue River to proactively supply irrigation water for agricultural production combined with maintaining the flow of the Nhue River and other water needs; Draining water from the Nhue River to the Red River for an area of ​​9,200 hectares of wards and communes: Xuan Phuong, Phu Dien, Nghia Do, Xuan Dinh, Dong Ngac, Thuong Cat, Phu Thuong, Tay Tuu, O Dien, Dan Phuong, Lien Minh, Hoai Duc, Son Dong; Improve ecological environment and water quality; Combined with the development of water transportation; Proactively respond to climate change
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500056725-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group A
Project implementation time
6 Years
Authority that issues the decision
Ban Quản lý dự án đầu tư xây dựng công trình hạ tầng kỹ thuật và nông nghiệp thành phố Hà Nội
Approval date
31/10/2025
Approval ID
473/QĐ-BQLHTKT&NN
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 18
1.Tender package No 10: Consulting on task setting, construction survey estimates (additional), design implementation after final design
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Set up tasks for construction survey work, design work and implementation after basic design according to regulations
Capital source details
Budget Hanoi city
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
2.Bidding package No. 11: Consulting on contractor selection for packages No. 14, 16, 17, 19, 27
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare E-Bidding Documents, evaluate E-bid documents, prepare E-bid evaluation reports for consulting, construction, and construction supervision packages in accordance with regulations
Capital source details
Hanoi city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
3.Bidding package No. 12: Consulting on contractor selection for bidding packages No. 18, 20, 26
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare E-HSMT (E-HSYC), evaluate E-bid documents (E-HSDX), prepare E-bid evaluation reports (E-HSDX) for equipment bidding packages, equipment monitoring, insurance, and mine clearance in accordance with regulations
Capital source details
Hanoi city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
4.Tender package No 13: Consultancy and supervision of construction survey in the design phase and implementation after final design
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervise construction surveys to serve design implementation after basic design
Capital source details
Hanoi city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
5.Bidding package No. 14: Consulting on design verification and implementation after TKCS, DT verification
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verify the design implemented after the basic design, verify the construction estimate
Capital source details
Hanoi city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
6.Package 15: Equipment price appraisal consultancy
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Project equipment valuation
Capital source details
Hanoi city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
7.Tender package No 16: Consulting on task setting, technical plans, and construction of mine and explosive material clearance
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Establish tasks, technical plans, and execute clearance of bombs, mines, and explosives
Capital source details
Hanoi city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
8.Bidding package No. 17: Construction survey consulting (additional); establish design for implementation after TKCS; BIM information modeling in the post-design implementation phase and construction of focal areas, canals and works on the canal, ensuring waterway traffic safety for construction (EC)
Tender/ Prequalification Notice ID
Contract execution period
1500 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Uncategoried
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction survey (additional); Establish implementation design after CS - Estimate; BIM information modeling in the post-design phase of implementation and construction of focal areas, canals and works on the canal, ensuring waterway traffic safety for construction
Capital source details
Hanoi city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
Package, Fixed Price and Adjusted Unit Price
Prequalification
No
Implementation location (After merge)
9.Tender package No 18: Consulting on design and implementation after TKCS; Supply and installation of pumps and mechanical equipment; Supply and installation of medium and low voltage electrical systems and MBA (EP)
Tender/ Prequalification Notice ID
Contract execution period
1500 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Uncategoried
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare implementation design after CS - Estimate; Supply and installation of pumps and mechanical equipment; Supply and installation of medium and low voltage electrical systems and MBA (EP)
Capital source details
Hanoi city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
10.Tender package No 19: Construction supervision consultancy
Tender/ Prequalification Notice ID
Contract execution period
1500 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervision of construction work
Capital source details
Hanoi city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
11.Tender package No 20: Equipment installation supervision consulting
Tender/ Prequalification Notice ID
Contract execution period
1500 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervision of equipment installation
Capital source details
Hanoi city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
12.Package 21: Environmental supervision consultant
Tender/ Prequalification Notice ID
Contract execution period
1500 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Environmental monitoring during construction and equipment installation
Capital source details
Hanoi city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
13.Bidding package No. 22: Consulting on establishing operating procedures
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Establish operating procedures for key project clusters
Capital source details
Hanoi city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the second quarter, 2029
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
14.Contractor No. 23: Consulting on establishing maintenance procedures
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Establish maintenance procedures for key project clusters
Capital source details
Hanoi city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the second quarter, 2029
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
15.Tender package No 24: Consulting on landmarking of irrigation works
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Marking the project's irrigation project corridor
Capital source details
Hanoi city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the second quarter, 2029
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
16.Bidding package No. 25: Consulting on appraisal of bidding documents, LCNT results
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Evaluate bidding documents, contractor selection results for contractor selection packages through open bidding
Capital source details
Hanoi city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
17.Tender package No 26: Construction insurance
Tender/ Prequalification Notice ID
Contract execution period
1500 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Insurance during construction and installation of construction equipment
Capital source details
Hanoi city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
By percentage
Prequalification
No
Implementation location (After merge)
18.Bidding package No. 27: Audit consulting
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Project independent audit
Capital source details
Hanoi city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter IV, 2029
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Component project 2: Construction of Lien Mac focal works cluster, Bac Tu Liem district, Hanoi city (phase 1)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Component project 2: Construction of Lien Mac focal works cluster, Bac Tu Liem district, Hanoi city (phase 1)" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 42

You did not use the site, Click here to remain logged. Timeout: 60 second