Contractor selection plan name
Construction replacement insulation 110kV Krong H'Nang - Eakar
Procurement name
Replace insulation 110kV Krong H'Nang - Eakar
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Shopping budget
To view full information, please Login or Register
Spending Category
Mandatory spending
Authority that issues the decision
Công ty Cổ phần Sông Ba
Approval date
07/07/2025
Approval ID
133/QĐ-SBA-TTĐ
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Filter name, Total investment, total investment, Lowest bid price, Highest bid price, Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 1
1.Construction replacement insulation 110kV Krong H'Nang - Eakar
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Replace the insulation of the line throughout the route from Pooctich TPP 110 KV Krong H’Nang to the Xa Pooctich TBA 110 KV EA Kar and 06 insulating 110 kV polymer chains in about 110 kV factory - TPP 110KV at MBA T1 and T2. - Handling adjustment of intermediaries, adjusting wires, accessories hanging wires to ensure the hammock when replacing insulation; remove maintenance and reinstall the support of the cylinder of the cylindrical position 78 to 86; Replace the pressed lock and the head connecting the cord of the cylinder 87. - Stretch the 3 -phase conductor from the position of the cylinder No. 77 to the position of the cylinder No. 87.
Capital source details
Capital for production and business
Contractor Selection Type
Restricted Match
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
July, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Ea Ly commune, Dak Lak province

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Construction replacement insulation 110kV Krong H'Nang - Eakar". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Construction replacement insulation 110kV Krong H'Nang - Eakar" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 4

You did not use the site, Click here to remain logged. Timeout: 60 second