Bidder Selection Plan

Consulting on quality control of construction structure

  Watching  
Project Contractor selection plan Bid award
Find: 12:56 07/01/2026
Contractor Selection Plan ID
PL2600002950-00
Publishing time
12:55 07/01/2026
Posting Status
Published
Contractor selection plan name
Consulting on quality control of construction structure
Name of project
Consulting on quality control of construction structure
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Other
Authority that issues the decision
CÔNG TY CỔ PHẦN CẤP NƯỚC BẾN THÀNH
Approval date
07/01/2026
Approval ID
002/QĐ-CNBT-QLDA
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Consulting on quality control of construction structure
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Workload: + Geological survey drilling (01 hole); + Verify the geometric dimensions of the building; + Check the stability of the project; + Check the quality of the construction structure (check 02 foundations); + Evaluate the load-bearing safety of the structure after renovating and installing elevators and converting corrugated iron roofs into reinforced concrete floors.
Capital source details
Repair capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
January 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Consulting on quality control of construction structure". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Consulting on quality control of construction structure" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 2

You did not use the site, Click here to remain logged. Timeout: 60 second