Bidder Selection Plan

Contractor selection plan 08 bidding packages for consultancy, procurement, construction and installation of M&E items under the investment project to build the infrastructure of the machine room of the general station at Viettel Hoa Lac Technical Center in 2022

  Watching      
Find: 11:09 24/11/2023
Contractor Selection Plan ID
PL2300096529-01
Publishing time
11:05 24/11/2023
Posting Status
Published
Contractor selection plan name
Contractor selection plan 08 bidding packages for consultancy, procurement, construction and installation of M&E items under the investment project to build the infrastructure of the machine room of the general station at Viettel Hoa Lac Technical Center in 2022
Bid Solicitor
Investor
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2300025969-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
25 Month
Location
Authority that issues the decision
Tập đoàn Công Nghiệp - Viễn thông Quân Đội
Approval date
12/06/2023
Approval ID
3903/QĐ-CNVTQĐ-ĐTH
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 8
1.Supplying materials, equipment and implementing the construction and installation of AC distribution system
Tender/ Prequalification Notice ID
Contract execution period
440 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Owner Contribution Amount
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2023
Type of contract
Fixed unit price
Prequalification
No
Location
2.Supplying materials and implementing construction and installation of busway systems connecting generators to electrical cabinets and UPS to racks
Tender/ Prequalification Notice ID
Contract execution period
440 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Owner Contribution Amount
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2023
Type of contract
Fixed unit price
Prequalification
No
Location
3.Deployment and installation of cable tray ladder system, lighting, C-bar for machine room General station Viettel Hoa Lac Technical Center
Tender/ Prequalification Notice ID
Contract execution period
410 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Owner Contribution Amount
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location
4.Supplying materials, equipment and implementing construction and installation of iBMS system for Viettel Hoa Lac technical center
Tender/ Prequalification Notice ID
Contract execution period
410 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Owner Contribution Amount
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2023
Type of contract
Fixed unit price
Prequalification
No
Location
5.Supply and installation of Rack systems and hot corridor cages
Tender/ Prequalification Notice ID
Contract execution period
375 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Capital source details
Owner Contribution Amount
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q3 2023
Type of contract
All in One
Prequalification
No
Location
6.Supply and installation of network infrastructure for machine room
Tender/ Prequalification Notice ID
Contract execution period
375 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Owner Contribution Amount
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2023
Type of contract
All in One
Prequalification
No
Location
7.Consulting, surveying, designing BVTC and making detailed estimates for the items of the investment project to build the infrastructure of the substation room at Viettel Hoa Lac Technical Center in 2022
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Capital source details
Owner Contribution Amount
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Location
8.Consulting to verify the design of construction drawings and estimate the items of the investment project to build the machine room infrastructure of the general station at Viettel Hoa Lac Technical Center in 2022
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Owner Contribution Amount
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2023
Type of contract
All in One
Prequalification
No
Location

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan 08 bidding packages for consultancy, procurement, construction and installation of M&E items under the investment project to build the infrastructure of the machine room of the general station at Viettel Hoa Lac Technical Center in 2022". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan 08 bidding packages for consultancy, procurement, construction and installation of M&E items under the investment project to build the infrastructure of the machine room of the general station at Viettel Hoa Lac Technical Center in 2022" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 16

Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8549 Projects are waiting for contractors
  • 417 Tender notices posted in the last 24 hours
  • 425 Contractor selection plan posted in the last 24 hours
  • 24859 Tender notices posted in the past month
  • 38639 Contractor selection plan posted in the last month
Consultants are supporting you
You are not logged in.
To view information, please Login or Register if you do not have an account.
Signing up is simple and completely free.
You did not use the site, Click here to remain logged. Timeout: 60 second