Maximize coal resources exploitation by open cast method; Promote existing infrastructure and equipment; Synchronously invest in advanced and modern equipment to exploit coal resources, contributing to stability and ensuring national energy security; maintain the Company's operation and stable development and ensure jobs for about 4,000 employees; contribute to local economic development.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register
QĐPD KHLCNT ĐC 7761.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
1.Tender package No 10: Consulting on preparing Construction Design for implementation after basic design (Protection Design) of the Coc Sau - Deo Nai mine cluster mining project
Consulting on preparing construction design and implementing after basic design (Elaborate design of BVTC) of Coc Sau - Deo Nai mine cluster mining project
Capital source details
Commercial loan and equity of Deo Nai Coal Joint Stock Company - Cot Sau - TKV
Consulting on preparing an application for an Environmental License for the Coc Sau - Deo Nai Mine Cluster Mining Project, according to the provisions of the Law on Environmental Protection No. 72/2020/QH14 dated November 17, 2020.
Capital source details
Commercial loan and equity of Deo Nai Coal Joint Stock Company - Cot Sau - TKV
Installing landmarks of the 1/500 detailed planning for the Coc Sau - Deo Nai mine cluster mining project, in accordance with the boundary markers of the project's detailed planning approved by the People's Committee of Cam Pha city in Decision No. 4038/QD-UBND dated October 30, 2023
Capital source details
Commercial loan and equity of Deo Nai Coal Joint Stock Company - Cot Sau - TKV
Equipment supply, installation, operating instructions, test run, handover and warranty: 01 hydraulic excavator with back bucket, crawler, bucket capacity ≥12 m3. All equipment is 100% new, unused, manufactured in 2024, guaranteed according to the Manufacturer's standards.
Capital source details
Commercial loan and equity of Deo Nai Coal Joint Stock Company - Cot Sau - TKV
Equipment supply, installation, operating instructions, test run, handover and warranty: 01 wheel loader, wheel loader, bucket capacity ≥6 m3. All equipment is 100% new, unused, manufactured 2024 - 2025, guaranteed according to the Manufacturer's standards.
Capital source details
Commercial loan and equity of Deo Nai - Cot Sau Coal Joint Stock Company - TKV
Equipment supply, installation, operating instructions, test run, handover and warranty: 20 dump trucks, rigid frame, load capacity of 90 ÷ 100 tons. All equipment is 100% new, unused, manufactured 2024 - 2025, guaranteed according to the Manufacturer's standards.
Capital source details
Commercial loan and equity of Deo Nai - Cot Sau Coal Joint Stock Company - TKV
Equipment supply, installation, operating instructions, test run, handover and warranty: 05 dump trucks, rigid frame, load capacity of 55÷60 tons. All equipment is 100% new, unused, manufactured 2024 - 2025, guaranteed according to the Manufacturer's standards.
Capital source details
Commercial loan and equity of Deo Nai - Cot Sau Coal Joint Stock Company - TKV
Equipment supply, installation, operating instructions, test run, handover and warranty: 01 crawler scraper, capacity ≥320 HP. All equipment is 100% new, unused, manufactured 2024 - 2025, guaranteed according to the Manufacturer's standards.
Capital source details
Commercial loan and equity of Deo Nai - Cot Sau Coal Joint Stock Company - TKV
Equipment supply, installation, operating instructions, test run, handover and warranty: 01 wheel grader, capacity ≥ 285 HP. All equipment is 100% new, unused, manufactured 2024 - 2025, guaranteed according to the Manufacturer's standards.
Capital source details
Commercial loan and equity of Deo Nai - Cot Sau Coal Joint Stock Company - TKV
Equipment supply, installation, operation instructions, test run, handover and warranty: 03 high-pressure dust spraying systems with spray radius ≥150m. All equipment is 100% new, unused, manufactured 2024 - 2025, guaranteed according to the Manufacturer's standards.
Capital source details
Commercial loan and equity of Deo Nai - Cot Sau Coal Joint Stock Company - TKV
Setting up landmarks for mineral exploitation of the Coc Sau - Deo Nai mine cluster mining project according to the boundary of the technical license approved by the Ministry of Natural Resources and Environment
Capital source details
Commercial loan and equity of Deo Nai - Cot Sau Coal Joint Stock Company - TKV
Equipment supply, installation, operating instructions, test run, handover, put into use and warranty 01 Field drainage system, landfill, is a 6 kV medium voltage soft starting cabinet to start 3 engines in turn:
- Type MVC4-60400-E-K-MULTI3 or equivalent. The soft start cabinet system includes: 01 input compartment, 01 soft start compartment, 03 engine output compartments connected together by busbars, voltage 6 kV, to soft start 03 water pump motors (can run 1 or 2 or 3 motors) with capacity (200 ÷ 1250) kW/motor.
- Connection type: 1 exposed/3 exposed, in and out by cable from the bottom of the cabinet.
- Cabinet size: Width x Depth x Height = 4650 x 1250 x 2550mm
Capital source details
Commercial loan and equity of Deo Nai - Cot Sau Coal Joint Stock Company - TKV
Equipment supply, installation, operating instructions, test run, handover, put into use and warranty: 01 hydraulic spherical rotary drilling machine, bore diameter ≥250 mm. All equipment is 100% new, unused, manufactured in 2025, guaranteed according to the Manufacturer's standards.
Capital source details
Commercial loans, equity of Deo Nai Coal Joint Stock Company - Pile Sau - TKV
Equipment supply, installation, operating instructions, test run, handover and warranty: 01 hydraulic excavator with back bucket, crawler, bucket capacity ≥12 m3. All equipment is 100% new, unused, manufactured in 2025, guaranteed according to the Manufacturer's standards.
Capital source details
Commercial loans, equity of Deo Nai Coal Joint Stock Company - Pile Sau - TKV
Equipment supply, installation, operation instructions, test run, handover and warranty: 03 high-pressure dust spraying systems with spray radius ≥150m. All equipment is 100% new, unused, manufactured in 2025, guaranteed according to the Manufacturer's standards.
Capital source details
Commercial loans, equity of Deo Nai Coal Joint Stock Company - Pile Sau - TKV
Equipment supply, installation, operating instructions, test run, handover and warranty: 30 dump trucks, rigid frame, load capacity of 90÷100 tons. All equipment is 100% new, unused, manufactured in 2026, guaranteed according to the Manufacturer's standards.
Capital source details
Commercial loans, equity of Deo Nai Coal Joint Stock Company - Pile Sau - TKV
Equipment supply, installation, operation instructions, test run, handover and warranty: 03 high-pressure dust spraying systems with spray radius ≥150m. All equipment is 100% new, unused, manufactured in 2026, guaranteed according to the Manufacturer's standards.
Capital source details
Commercial loans, equity of Deo Nai Coal Joint Stock Company - Pile Sau - TKV
Equipment supply, installation, operating instructions, test run, handover, put into use and warranty: 01 hydraulic spherical rotary drilling machine, bore diameter ≥250 mm. All equipment is 100% new, unused, manufactured in 2027, guaranteed according to the Manufacturer's standards.
Capital source details
Commercial loans, equity of Deo Nai Coal Joint Stock Company - Pile Sau - TKV
Equipment supply, installation, operating instructions, test run, handover and warranty: 03 hydraulic excavators with back bucket, crawler, bucket capacity ≥12 m3. All equipment is 100% new, unused, manufactured in 2027, guaranteed according to the Manufacturer's standards.
Capital source details
Commercial loans, equity of Deo Nai Coal Joint Stock Company - Pile Sau - TKV
Equipment supply, installation, operating instructions, test run, handover, put into use and warranty: 01 hydraulic excavator with back bucket, crawler, bucket capacity 6 ÷ 7 m3. All equipment is 100% new, unused, manufactured in 2027, guaranteed according to the Manufacturer's standards.
Capital source details
Commercial loans, equity of Deo Nai Coal Joint Stock Company - Pile Sau - TKV
Equipment supply, installation, operating instructions, test run, handover and warranty: 01 wheel loader, wheel loader, bucket capacity ≥6 m3. All equipment is 100% new, unused, manufactured in 2027, guaranteed according to the Manufacturer's standards.
Capital source details
Commercial loans, equity of Deo Nai Coal Joint Stock Company - Pile Sau - TKV
Equipment supply, installation, operating instructions, test run, handover and warranty: 10 dump trucks, rigid frame, load capacity of 90÷100 tons. All equipment is 100% new, unused, manufactured in 2027, guaranteed according to the Manufacturer's standards.
Capital source details
Commercial loans, equity of Deo Nai Coal Joint Stock Company - Pile Sau - TKV
Equipment supply, installation, operating instructions, test run, handover and warranty: 05 dump trucks, rigid frame, load capacity of 55÷60 tons. All equipment is 100% new, unused, manufactured in 2027, guaranteed according to the Manufacturer's standards.
Capital source details
Commercial loans, equity of Deo Nai Coal Joint Stock Company - Pile Sau - TKV
Equipment supply, installation, operating instructions, test run, handover and warranty: 01 crawler scraper, capacity ≥320 HP. All equipment is 100% new, unused, manufactured in 2027, guaranteed according to the Manufacturer's standards.
Capital source details
Commercial loans, equity of Deo Nai Coal Joint Stock Company - Pile Sau - TKV
27.Tender package No 10.1: Consultancy for verification of Construction design implemented after basic design (BVTC Design) of Coc Sau - Deo Nai mine cluster mining project
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan for Coc Sau - Deo Nai mine cluster mining project". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan for Coc Sau - Deo Nai mine cluster mining project" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.