Bidder Selection Plan

Contractor selection plan for Ha Rang mine extension underground mining project

  Watching      
Find: 13:27 08/11/2024
Contractor Selection Plan ID
PL2400260620-00
Publishing time
13:26 08/11/2024
Posting Status
Published
Contractor selection plan name
Contractor selection plan for Ha Rang mine extension underground mining project
Investment objective
Maintaining underground coal mining output and stabilizing jobs for staff and workers of Hon Gai Coal Company - TKV, meeting the coal demand of the national economy, contributing to realizing the goal of developing Vietnam's coal industry according to approved plans.
Project management forms
BQLDA major - area
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2400066008-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
4 Years
Authority that issues the decision
Tập đoàn Công nghiệp Than - Khoáng sản Việt Nam
Approval date
07/11/2024
Approval ID
2071/QĐ-TKV
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 46
1.Tender package No 1: Construction of a number of tunnel openings and preparation
Tender/ Prequalification Notice ID
Contract execution period
48 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Build a number of tunnels to open and prepare
Capital source details
Commercial loans and equity
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
According to adjusted unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
2.Tender package No 2: Construction of station platform, station tunnel and some tunnels to prepare seams 13 and 14
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of the station platform, station tunnel and some tunnels to prepare seams 13 and 14
Capital source details
Commercial loans and equity
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
According to adjusted unit price
Prequalification
No
Implementation location (After merge)
Cẩm Phả City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
3.Tender package No 3: Construction of fire water supply pipeline system in the furnace
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Install steel pipe systems, valves, concrete pipe supports, water intakes, fire sprinklers, fire extinguishers...
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter IV, 2027
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
4.Tender package No 4: Construction of production water supply pipeline system inside the furnace and outside the site
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Install steel pipes, valves and accompanying accessories inside the furnace and outside the premises
Capital source details
Commercial loans and equity
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2027
Type of contract
According to adjusted unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
5.Tender package No 5: Construction of compressed air supply pipeline system
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Installation of steel pipes, HDPE pipes and accompanying accessories
Capital source details
Commercial loans and equity
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2027
Type of contract
According to adjusted unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
6.Tender package No 6: Supply of equipment, construction and installation of communication systems
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing equipment, building and installing communication systems
Capital source details
Commercial loans and equity
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2028
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
7.Tender package No 7: Supply of equipment, construction and installation of methane gas warning system
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing equipment, building and installing methane warning systems
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2027
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
8.Tender package No 8: Supply of equipment, construction and installation of surveillance camera system
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing equipment, building and installing surveillance and people control camera systems
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2028
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
9.Tender package No 9: Supply of equipment, construction and installation of conveyor control automation system
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply of equipment, construction and installation of conveyor control automation system
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the second quarter, 2028
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Cẩm Phả City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
10.Tender package No 10: Construction of pump tunnel drainage system
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supplying pipes and accessories, constructing and installing a -250 pump tunnel drainage piping system
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2027
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
11.Tender package No 11: Construction of ground items
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of roads, drainage ditches, fence gates, winch shelters, well mouth shelters
Capital source details
Commercial loans and equity
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
12.Tender package No 12: Construction of main fan station
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of main fan station
Capital source details
Commercial loans and equity
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2028
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
13.Tender package No 13: Supply of equipment, construction and installation of off-site fire protection system
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply of equipment, construction and installation of off-site fire protection systems
Capital source details
Commercial loans and equity
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Cẩm Phả City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
14.Tender package No 14: Supply of equipment, construction and installation of wastewater treatment system
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply of equipment, construction and installation of wastewater treatment system with capacity of 900m3/h
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
15.Tender package No 15: Construction of power lines, power stations and ground power supply system
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Construction of 35/6kV transformer station; - Construction of diesel power station; - Construction of 6kV distribution station; - Construction of transmission lines - 35kV; - Construction of ground power supply system.
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Cẩm Phả City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
16.Tender package No 16: Construction of a transportation workshop, waste warehouse and spare parts warehouse
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Construction of a warehouse to store hazardous waste; - Construction of a transport mechanical and electrical workshop; - Construction of warehouse for spare parts and materials.
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter IV, 2026
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
17.Tender package No 17: Construction and installation of main well and secondary well power supply systems
Tender/ Prequalification Notice ID
Contract execution period
12 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction and installation of power cables, lighting, control, signals and accessories for main and auxiliary wells
Capital source details
Commercial loans and equity
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
According to adjusted unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
18.Tender package No 18: Construction of power supply system for items in the furnace
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of power supply system for pumping tunnels, power stations, fire depots, repair depots and -250 level battery charging tunnels
Capital source details
Commercial loans and equity
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the second quarter, 2027
Type of contract
According to adjusted unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
19.Tender package No 19: Supply of equipment for horizontal and inclined longwall furnaces and flexible longwall furnaces
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing equipment for horizontal and inclined longwall furnaces and flexible longwall furnaces
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the second quarter, 2028
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
20.Tender package No 20: Providing equipment for transporting main wells and secondary wells
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing equipment for transporting main wells and secondary wells
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2027
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
21.Tender package No 21: Supply of conveyors and control equipment
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Provide conveyor belts and control equipment
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the second quarter, 2027
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
22.Tender package No 22: Upgrading the main well winch system
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Upgrade passenger winch
Capital source details
Commercial loans and equity
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
23.Tender package No 23: Supply of mono rail system using compressed air
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply Monoray using compressed air
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2027
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
24.Tender package No 24: Supply and installation of -250 level pumping tunnel equipment
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply and installation of -250 level pumping tunnel equipment
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the second quarter, 2027
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
25.Tender package No 25: Supply and installation of main fan station equipment
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply, installation and testing of main blower station equipment
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter IV, 2027
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
26.Tender package No 26: Supply and installation of 35/6kV transformer station equipment
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply, installation and testing of 35/6kV transformer station equipment
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
27.Tender package No 27: Supply and installation of Diesel power station equipment
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply, installation and testing of Diesel power station equipment
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
28.Tender package No 28: Supply and installation of -250 power station equipment, depots and battery charging tunnels
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply and installation of -250 power station equipment, depots and battery charging tunnels
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter IV, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
29.Tender package No 29: Supply and installation of power supply system equipment in the furnace
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply and installation of power supply system equipment in the furnace
Capital source details
Commercial loans and equity
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2027
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
30.Tender package No 30: Supply and installation of ground electrical equipment
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply and installation of electrical equipment outside the site
Capital source details
Commercial loans and equity
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
31.Tender package No 31: Installing equipment in the furnace
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Installation of transportation equipment, main well equipment, secondary wells and longwall equipment
Capital source details
Commercial loans and equity
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the second quarter, 2027
Type of contract
According to adjusted unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
32.Tender package No 32: Making TKKT-DT
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Technical design, estimate
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
33.Tender package No 33: TKBVTC-DT
Tender/ Prequalification Notice ID
Contract execution period
48 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Design construction drawings, cost estimates
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
34.Bidding package No. 34: Verification of Technical Design-DT
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Examination of technical design, estimation
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
35.Tender package No 35: Verification of TKBVTC-DT
Tender/ Prequalification Notice ID
Contract execution period
48 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verification of construction drawing design, cost estimate
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
36.Tender package No 36: Supervision of construction of items in the furnace
Tender/ Prequalification Notice ID
Contract execution period
48 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervise construction of items in the furnace
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
37.Tender package No 37: Construction supervision of off-site items
Tender/ Prequalification Notice ID
Contract execution period
42 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervise construction of off-site items
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
38.Tender package No 38: Equipment installation supervision
Tender/ Prequalification Notice ID
Contract execution period
42 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Monitoring and installing equipment and automation systems
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
39.Bidding package No. 39: Supervising the survey work of DCCT-DCTV
Tender/ Prequalification Notice ID
Contract execution period
75 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervise the survey work of DCT-DCTV to serve the design of wells
Capital source details
Commercial loans and equity
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
40.Bidding package No. 40: Establishing the survey task for DCCT-DCTV
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Set up the task of surveying DCCT - DCTV to serve the design of wells
Capital source details
Commercial loans and equity
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Cẩm Phả City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
41.Tender package No 41: Survey drilling - CCV
Tender/ Prequalification Notice ID
Contract execution period
75 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Drilling survey of DCT - DCT to serve the design of wells
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Cẩm Phả City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
42.Tender package No 42: Drilling and survey of DRC to serve the design of works on the ground
Tender/ Prequalification Notice ID
Contract execution period
75 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Drilling to survey the DCT serves the design of works on the ground
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2025
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
43.Bidding package No. 43: Prepare bidding documents and evaluate construction bidding documents
Tender/ Prequalification Notice ID
Contract execution period
36 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Preparation of bids and evaluation of bids for construction
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
44.Tender package No 44: Prepare a project for discharging waste into water sources
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare a project for discharging waste into water sources
Capital source details
Commercial loans and equity
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
45.Bidding package No. 45: Construction insurance
Tender/ Prequalification Notice ID
Contract execution period
42 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction insurance during construction
Capital source details
Commercial loans and equity
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
46.Bidding package No. 46: Audit of completed project
Tender/ Prequalification Notice ID
Contract execution period
30 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Completed project audit
Capital source details
Commercial loans and equity
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2027
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan for Ha Rang mine extension underground mining project". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan for Ha Rang mine extension underground mining project" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 63

You did not use the site, Click here to remain logged. Timeout: 60 second