Bidder Selection Plan

Contractor selection plan for Ho Chi Minh City Ring Road 3 Construction Project, Tan Van - Binh Chuan section (section coincides with My Phuoc - Tan Van road, 15.3km long) (step in preparing a pre-feasibility study report)

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 21:56 02/06/2026
Contractor Selection Plan ID
PL2600153209-00
Publishing time
17:04 02/06/2026
Posting Status
Published
Contractor selection plan name
Contractor selection plan for Ho Chi Minh City Ring Road 3 Construction Project, Tan Van - Binh Chuan section (section coincides with My Phuoc - Tan Van road, 15.3km long) (step in preparing a pre-feasibility study report)
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Spending Category
Investment and Development Spending
Authority that issues the decision
Ban Quản lý dự án đầu tư xây dựng các công trình giao thông
Approval date
27/05/2026
Approval ID
4618/QD-BQLDAGT-KHĐT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 3
1.Survey consultancy, pre -feasibility study report and project information model (BIM)
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey, investigate and collect data (topography, geology, hydrology...); Pre-feasibility study report preparation and building information modeling (BIM)
Capital source details
city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
2.Consulting on verification of pre-feasibility study reports and building information models (BIM)
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verification of pre-feasibility study reports and building information models (BIM)
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No
3.Consulting on preparing bidding documents and evaluating bids Bidding packages Consulting on surveys, preparing pre-feasibility study reports and building information models (BIM)
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare bidding documents, evaluate bidding documents for bidding packages, Survey consulting, prepare pre-feasibility study reports and building information models (BIM)
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan for Ho Chi Minh City Ring Road 3 Construction Project, Tan Van - Binh Chuan section (section coincides with My Phuoc - Tan Van road, 15.3km long) (step in preparing a pre-feasibility study report)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan for Ho Chi Minh City Ring Road 3 Construction Project, Tan Van - Binh Chuan section (section coincides with My Phuoc - Tan Van road, 15.3km long) (step in preparing a pre-feasibility study report)" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 16

You did not use the site, Click here to remain logged. Timeout: 60 second