Bidder Selection Plan

Contractor selection plan for Ngoc Tem hydroelectric project

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 08:47 31/07/2026
Contractor Selection Plan ID
PL2500350984-03
Publishing time
08:46 31/07/2026
Posting Status
Published
Contractor selection plan name
Contractor selection plan for Ngoc Tem hydroelectric project
Investment objective
Connect to the national grid system and sell electricity to Vietnam Electricity Corporation
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500070173-04
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
9 Years
Authority that issues the decision
Hội đồng thành viên Công ty TNHH thủy điện Ngọc Tem
Approval date
16/07/2026
Approval ID
16/QĐ-NT-HĐTV
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Publication date, Bidding package information (View changes)

- Change: Total investment, total investment, Highest bid price, Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Highest bid price, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 36
1.Technical Design Consulting; Design construction drawings; Design and manufacture hydraulic mechanical equipment; Prepare bidding documents for construction and prepare bidding documents for equipment procurement
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on technical design, construction drawing design and design and fabrication of hydraulic mechanical equipment
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
According to adjusted unit price
Implementation location
Implementation location (After merge)
Prequalification
No
2.Consulting on evaluating construction bids and equipment procurement bids
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Evaluate construction bids and equipment procurement bids
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
3.Providing synchronous electromechanical equipment and technical services
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
International
Bidding method
Directly
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing synchronous electromechanical equipment and technical services
Capital source details
100% Loan capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
4.Consultancy of construction supervision and equipment installation
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consultancy of construction supervision and equipment installation
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
5.Transportation and storage of factory electromechanical equipment
Tender/ Prequalification Notice ID
Contract execution period
6 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Transportation and storage of factory electromechanical equipment
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2027
Type of contract
Fixed unit price
Implementation location
Implementation location (After merge)
Prequalification
No
6.Install and test and calibrate electromechanical equipment
Tender/ Prequalification Notice ID
Contract execution period
9 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Install and test and calibrate electromechanical equipment
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the second quarter, 2027
Type of contract
Fixed unit price
Implementation location
Implementation location (After merge)
Prequalification
No
7.Construction of operating managers
Tender/ Prequalification Notice ID
Contract execution period
3 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of operating managers
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2028
Type of contract
Fixed unit price
Implementation location
Implementation location (After merge)
Prequalification
No
8.Construction and expansion of highway compartment and underground cable of TBA110kV
Tender/ Prequalification Notice ID
Contract execution period
3 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction and expansion of highway compartment and underground cable of TBA110kV
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2028
Type of contract
Fixed unit price
Implementation location
Implementation location (After merge)
Prequalification
No
9.Preparation work, leveling, and auxiliary works
Tender/ Prequalification Notice ID
Contract execution period
3 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Preparation work, leveling, and auxiliary works
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
10.Supply and installation of monitoring equipment and pressure tower water level measuring equipment
Tender/ Prequalification Notice ID
Contract execution period
2 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply and installation of monitoring equipment and pressure tower water level measuring equipment
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter IV, 2027
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
11.Training of operating workers
Tender/ Prequalification Notice ID
Contract execution period
6 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Training of operating workers
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2027
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
12.Consulting on reservoir operating process
Tender/ Prequalification Notice ID
Contract execution period
3 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on establishing reservoir operating procedures (adjustable when Ngoc Tem Hydropower Plant is available)
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2027
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
13.Installing corridor markers to protect the reservoir and hydraulic triangle markers
Tender/ Prequalification Notice ID
Contract execution period
2 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Installing corridor markers to protect the reservoir and hydraulic triangle markers
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2027
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
14.Consulting on preparing electricity operating license documents
Tender/ Prequalification Notice ID
Contract execution period
6 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on preparing electricity operating license documents
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2027
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
15.Consulting on preparing dam and reservoir safety records
Tender/ Prequalification Notice ID
Contract execution period
3 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on preparing dam and reservoir safety records
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2027
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
16.Consulting on technical design verification - Total estimates
Tender/ Prequalification Notice ID
Contract execution period
25 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on technical design verification - Total estimates
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
17.Consulting on geological description
Tender/ Prequalification Notice ID
Contract execution period
6 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on geological description
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
18.Consulting on building hydraulic landmarks to serve construction
Tender/ Prequalification Notice ID
Contract execution period
2 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on building hydraulic landmarks to serve construction
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
19.Consulting on document preparation and agreement on meter measurement and inspection
Tender/ Prequalification Notice ID
Contract execution period
6 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on preparing documents and agreeing on connection plans, measuring and inspecting meters
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2027
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
20.Consulting on preparing documents to apply for licenses to exploit and use water resources
Tender/ Prequalification Notice ID
Contract execution period
6 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on preparing documents to apply for a license to exploit and use water resources (when there is a pearl hydropower plant)
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the second quarter, 2027
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
21.Groundbreaking project
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Groundbreaking project
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
22.Construction insurance
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction insurance
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
23.Work deformity monitoring
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Work deformity monitoring
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the second quarter, 2028
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
24.Quality testing works
Tender/ Prequalification Notice ID
Contract execution period
1 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Quality testing works
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the second quarter, 2028
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
25.Construction, processing and installation of project items: Water tunnels, Vertical wells, Hydroelectric power plants and Tunnel lining steel
Tender/ Prequalification Notice ID
Contract execution period
23 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction, processing and installation of project items: Water tunnels, Vertical wells, Hydroelectric power plants and Tunnel lining steel
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
According to adjusted unit price
Implementation location
Implementation location (After merge)
Prequalification
No
26.Supply and installation of fire protection equipment
Tender/ Prequalification Notice ID
Contract execution period
6 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply and installation of fire protection equipment
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2027
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
27.Consulting, verifying design and manufacturing hydraulic mechanical equipment
Tender/ Prequalification Notice ID
Contract execution period
3 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting, verifying design and manufacturing hydraulic mechanical equipment
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
28.Consulting on technology design verification of mechanical and electrical packages
Tender/ Prequalification Notice ID
Contract execution period
3 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on technology design verification of mechanical and electrical packages
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
29.Consulting on design and distribution of works
Tender/ Prequalification Notice ID
Contract execution period
1 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on design and distribution of works
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
30.Prepare electricity purchase and sale documents
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare electricity purchase and sale documents
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2027
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
31.Verify and approve project settlement
Tender/ Prequalification Notice ID
Contract execution period
1 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verify and approve project settlement
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the second quarter, 2028
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
32.Cost of independent audit
Tender/ Prequalification Notice ID
Contract execution period
2 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Cost of independent audit
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
In the second quarter, 2028
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
33.Costs for cleaning the construction site and returning technical infrastructure
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Costs for cleaning the construction site and returning technical infrastructure
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the second quarter, 2028
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
34.SCADA Agreement
Tender/ Prequalification Notice ID
Contract execution period
1 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
SCADA Agreement
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2028
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
35.Relay negotiable fee
Tender/ Prequalification Notice ID
Contract execution period
1 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Relay negotiable fee
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2028
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
36.Cost of agreement on measurement system and measurement data collection system
Tender/ Prequalification Notice ID
Contract execution period
1 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Cost of agreement on measurement system and measurement data collection system
Capital source details
30% equity capital, 70% loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2028
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan for Ngoc Tem hydroelectric project". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan for Ngoc Tem hydroelectric project" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 3

You did not use the site, Click here to remain logged. Timeout: 60 second