Bidder Selection Plan

Contractor selection plan for project preparation phase Project: "Improving power supply capacity of medium voltage lines 480 E1.3 and 476 E1.3"

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 16:54 26/12/2025
Contractor Selection Plan ID
PL2500368536-00
Publishing time
16:52 26/12/2025
Posting Status
Published
Contractor selection plan name
Contractor selection plan for project preparation phase Project: "Improving power supply capacity of medium voltage lines 480 E1.3 and 476 E1.3"
Investment objective
- Replace cables that have been in operation for many years. - Improve power supply capacity, ensure safe power supply, reduce the number of medium voltage grid incidents, and improve power supply reliability.
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500072760-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
2026 Years
Authority that issues the decision
CÔNG TY ĐIỆN LỰC HOÀN KIẾM
Approval date
26/12/2025
Approval ID
7223/QĐ-PCHOANKIEM
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Package 02-TV-2026.3: Consulting on preparation of Technical Economic Report for the project: "Improving power supply capacity of medium voltage lines 480 E1.3 and 476 E1.3"
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consultancy on making technical and economic reports of works
Capital source details
KHCB
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan for project preparation phase Project: "Improving power supply capacity of medium voltage lines 480 E1.3 and 476 E1.3"". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan for project preparation phase Project: "Improving power supply capacity of medium voltage lines 480 E1.3 and 476 E1.3"" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 2

You did not use the site, Click here to remain logged. Timeout: 60 second