Contractor selection plan for project preparation phase Project: Renovating and resolving overloading of the power grid in Chau Thanh Electricity area.
Contractor selection plan for project preparation phase Project: Renovating and resolving overloading of the power grid in Chau Thanh Electricity area.
Currently, the proportion of single-phase medium and low voltage power grid belonging to Tien Giang Power Company's assets is quite large, causing many disadvantages in management and operation; Specifically, by August 2024, the single-phase medium-voltage grid accounts for 53.5% of the total length of the medium-voltage grid, and the single-phase low-voltage grid accounts for 91.5% of the total length of the low-voltage grid. Investment in projects to gradually upgrade the 1-phase medium-low voltage power grid to 3-phase; prevent the risk of full load and overload of the power grid; Solve pressure drop, reduce power loss.
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
1978-QD phe duyet lai KHLCNT CBDA- CT-GQQT-CHAU THANH 2025.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 3
1.Consulting on surveys to serve the preparation of construction investment feasibility reports and construction investment feasibility report documents; survey to serve the preparation of TKBVTC-DT, preparation of TKBVTC-DT documents
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan for project preparation phase Project: Renovating and resolving overloading of the power grid in Chau Thanh Electricity area.". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan for project preparation phase Project: Renovating and resolving overloading of the power grid in Chau Thanh Electricity area." plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.