Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2019
Contract Type
All in one
Prequalification
No
Location
6.Package 35: Construction of waterproofing treatment and diving inspection, assessment upstream of old cracks and expansion joints EJ08 Song Bung 4 hydroelectric dam
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2019
Contract Type
All in one
Prequalification
No
Location
7.Package 36: Consulting survey, preparing economic and technical report on repair and reinforcement of the operation road of Song Bung 2 Hydropower Plant
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2019
Contract Type
All in one
Prequalification
No
Location
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan for the 7th installment of 2019". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan for the 7th installment of 2019" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.