Bidder Selection Plan

Contractor selection plan for the Integrated Adaptive Development project in Quang Nam province

  Watching      
Find: 13:49 09/07/2026
Contractor Selection Plan ID
PL2400163797-07
Publishing time
13:48 09/07/2026
Posting Status
Published
Contractor selection plan name
Contractor selection plan for the Integrated Adaptive Development project in Quang Nam province
Investment objective
To enhance access to adaptive infrastructure services and improve capacity for planning and management of adaptive development against natural disaster risks in Project implementation areas
Project management forms
BQLDA major - area
Using ODA capital?
Have
Funding source
ODA capital
Project number
PR2400043553-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group A
Project implementation time
5 Years
Authority that issues the decision
Ban Quản lý dự án đầu tư xây dựng các công trình giao thông và nông nghiệp Đà Nẵng
Approval date
07/07/2026
Approval ID
739/QĐ-BQLGT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Decision-making agency, Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Lowest bid price, Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Investor, Publication date, Bidding package information (View changes)

- Change: Investor, Highest bid price, Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Highest bid price, Decision-making agency, Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 35
1.TV01 - Set up survey and design tasks for financial protection
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Set up survey and design tasks for financial protection
Capital source details
ODA loan from WB; Counterpart capital from the provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
2.TV02 - Verification of survey and design tasks for financial protection
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verify survey and design tasks of financial protection
Capital source details
ODA loan from WB; Counterpart capital from the Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
3.TV03 - Supervision and survey of financial protection steps
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervision of the BVTC step survey
Capital source details
ODA loan from WB, counterpart capital from Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
4.TV04 - Prepare bidding documents and evaluate bids for bidding packages TV05, TV06, TV07, TV08 and TV09; prepare bids and evaluate bids for bidding packages TV11, TV12, and BM
Tender/ Prequalification Notice ID
Contract execution period
255 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Prepare bidding documents and evaluate bidding documents for 05 bidding packages for survey and design of physical protection (TV05, TV06, TV07, TV08, TV09) - Prepare bids and evaluate bids for 03 bidding packages for consulting and construction of mine and explosive ordnance clearance (TV11, TV12, BM)
Capital source details
ODA loan from WB, counterpart capital from Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
5.TV05 - Consulting on surveying, designing BVTC - project estimate: Dredging Truong Giang River
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on surveying, designing BVTC - project estimates: Dredging Truong Giang River
Capital source details
ODA loan from WB, counterpart capital from Provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
6.TV06 - Consulting on surveying and designing construction site protection: Construction of bridges across the Truong Giang River (Binh Duong Bridge, Hung My Bridge, Binh Nam Bridge, Tinh Thuy Bridge, Tam Tien Bridge, Tam Tien People's Village)
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Consultancy on surveying, preparing BVTC design-project estimates: Construction of bridges across the Truong Giang River (Binh Duong Bridge, Hung My Bridge, Binh Nam Bridge, Tinh Thuy Bridge, Tam Tien Bridge, Tam Tien People's Bridge)
Capital source details
ODA loan from WB, counterpart capital from Provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
7.TV07 - Survey consulting, design of financial protection - project estimates: Tam Ky flood drainage complex
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on surveying, preparing design of financial protection and project estimates: Tam Ky flood drainage complex
Capital source details
ODA loan from WB, counterpart capital from Provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
8.TV08 - Consulting on surveying, preparing design, design and estimate of Tam Thanh bridge project
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consultancy on surveying, preparing design and estimates for Tam Thanh bridge project
Capital source details
ODA loan from WB, counterpart capital from Provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
9.TV09 - Consulting on verifying the design of financial protection - estimating
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting in verification of BVTC design-mathematical
Capital source details
ODA loan from WB, counterpart capital from Provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
10.TV10 - Consulting on investigation and assessment of forest status
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting forest investigation and evaluation
Capital source details
30
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
11.TV11 - Survey, prepare technical construction plans and estimates for mine and explosive ordnance clearance
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Surveying and preparing construction techniques and estimates of mine clearance and explosive objects
Capital source details
ODA loan from WB, counterpart capital from Provincial budget
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
12.TV12 - Supervising construction of bomb, mine and explosive material clearance
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervising the clearance of mines and explosives
Capital source details
ODA loan from WB, counterpart capital from Provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
13.BM - Construction of bomb, mine and explosive material clearance
Tender/ Prequalification Notice ID
Contract execution period
145 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of clearance of bombs, mines, explosives and disposal of explosives found during construction (if any).
Capital source details
ODA loan from WB, counterpart capital from Provincial budget
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
14.Make adjustable feasibility research reports
Tender/ Prequalification Notice ID
Contract execution period
75 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Make adjustable feasibility research reports
Capital source details
ODA loan capital from WB, city budget capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
15.Examination of adjustment and feasibility study report
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Examination of adjustment and feasibility study report
Capital source details
ODA loan capital and city budget counterpart funds
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
16.TV14: Consulting on preparing bidding documents and evaluating bidding documents
Tender/ Prequalification Notice ID
Contract execution period
630 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Establishing tasks, preparing bidding documents and evaluating bidding documents for consulting and construction packages (Establishing tasks, preparing bidding documents and evaluating bidding documents for consulting and construction packages; Costs for setting up tasks and preparing bidding documents and evaluating bidding documents for consulting packages for environmental and social safety monitoring; Costs for preparing bidding documents and evaluating bidding documents for bidding packages for selecting construction contractors and project insurance; Costs for setting up tasks and preparing bidding documents and evaluating bidding documents for consulting and verifying safety). total traffic; Cost of preparing the task and preparing the bidding documents and evaluating the bidding documents for the construction quality inspection consulting package; Costs of preparing the bidding documents and evaluating the bidding documents for the bidding package for construction and equipment supervision; Costs of preparing the bidding documents and evaluating the bidding documents for the construction audit consulting bidding package; Costs of preparing the tasks and preparing the bidding documents and evaluating the bidding documents for the bidding package for the consulting and evaluating project effectiveness)
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
17.TV15: Supervision of construction of bridges across the Truong Giang River (Binh Duong, Hung My, Thuy Province, Binh Nam, Tam Tien, Tam Tien bridges)
Tender/ Prequalification Notice ID
Contract execution period
1400 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervising the construction of bridges across the Truong Giang River (Binh Duong, Hung My, Thuy Province, Binh Nam, Tam Tien, Tam Tien bridges)
Capital source details
city budget
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
18.TV16: Construction supervision of Truong Giang River dredging projects
Tender/ Prequalification Notice ID
Contract execution period
1400 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervision of construction and dredging of Truong Giang River
Capital source details
city budget
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
19.TV17: Consulting on construction supervision of Tam Thanh bridge; Tam Ky flood drainage complex
Tender/ Prequalification Notice ID
Contract execution period
1200 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervising the construction of Tam Thanh bridge; Tam Ky flood drainage complex
Capital source details
city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
20.TV18: Independent monitoring of environment and social safety
Tender/ Prequalification Notice ID
Contract execution period
1400 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out the independent and social supervision
Capital source details
city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Second quarter, 2026
Type of contract
Timed
Implementation location
Implementation location (After merge)
Prequalification
No
21.TV19: Monitor and evaluate project effectiveness
Tender/ Prequalification Notice ID
Contract execution period
1600 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out monitoring and evaluating project effectiveness
Capital source details
city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Second quarter, 2026
Type of contract
Timed
Implementation location
Implementation location (After merge)
Prequalification
No
22.TV20: Traffic safety inspection
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Inspect traffic safety before accepting and handing over the project into operation
Capital source details
city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
In the second quarter, 2027
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
23.TV21: Construction quality inspection
Tender/ Prequalification Notice ID
Contract execution period
600 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out construction quality testing
Capital source details
city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter IV, 2027
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
24.TV22: Construction audit
Tender/ Prequalification Notice ID
Contract execution period
1100 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out audits to serve final settlement of projects
Capital source details
city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter IV, 2027
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
25.QN-WB-01: Construction of bridge across Truong Giang River - Binh Duong Bridge
Tender/ Prequalification Notice ID
Contract execution period
720 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
WB
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Binh Duong Bridge
Capital source details
WB loan and city budget counterpart capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
According to adjusted unit price
Implementation location
Implementation location (After merge)
Prequalification
No
26.QN-WB-02: Construction of bridge across Truong Giang River - Hung My Bridge
Tender/ Prequalification Notice ID
Contract execution period
720 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
WB
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Hung My bridge
Capital source details
WB loan and city budget counterpart capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
According to adjusted unit price
Implementation location
Implementation location (After merge)
Prequalification
No
27.QN-WB-03: Construction of bridge across Truong Giang River - Binh Nam Bridge
Tender/ Prequalification Notice ID
Contract execution period
720 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
WB
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Binh Nam bridge
Capital source details
WB loan and counterpart capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
According to adjusted unit price
Implementation location
Implementation location (After merge)
Prequalification
No
28.QN-WB-04: Construction of bridge across Truong Giang River - Thuy Province Bridge
Tender/ Prequalification Notice ID
Contract execution period
720 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
WB
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Tinh Thuy Bridge
Capital source details
WB loan and city budget counterpart capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
According to adjusted unit price
Implementation location
Implementation location (After merge)
Prequalification
No
29.QN-WB-05: Construction of bridge across Truong Giang River - Tam Thanh Bridge
Tender/ Prequalification Notice ID
Contract execution period
1080 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
WB
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Tam Thanh bridge
Capital source details
WB loan and city budget counterpart capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter IV, 2026
Type of contract
According to adjusted unit price
Implementation location
Implementation location (After merge)
Prequalification
No
30.QN-WB-06: Construction of bridge across Truong Giang River - Tam Tien Bridge, Tam Tien people's livelihood
Tender/ Prequalification Notice ID
Contract execution period
720 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
WB
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Tam Tien Bridge, Tam Tien people's livelihood
Capital source details
WB loan and city budget counterpart capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
According to adjusted unit price
Implementation location
Implementation location (After merge)
Prequalification
No
31.QN-WB-07: Dredging Truong Giang River - Segment 1 - Km0-Km30
Tender/ Prequalification Notice ID
Contract execution period
990 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
WB
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Dredging Truong Giang River – Segment 1 – Km0-Km30
Capital source details
WB loan and counterpart capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
According to adjusted unit price
Implementation location
Implementation location (After merge)
Prequalification
No
32.AN-WB-08: Dredging Truong Giang River - Segment 2 - Km30-Km60
Tender/ Prequalification Notice ID
Contract execution period
840 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
WB
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Dredging Truong Giang River – Segment 2 – Km30-Km60
Capital source details
WB loan and counterpart capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
According to adjusted unit price
Implementation location
Implementation location (After merge)
Prequalification
No
33.QN-WB-09: Tam Ky flood drainage complex
Tender/ Prequalification Notice ID
Contract execution period
900 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
WB
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of Tam Ky flood drainage complex
Capital source details
WB loan and city budget counterpart capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter IV, 2026
Type of contract
According to adjusted unit price
Implementation location
Implementation location (After merge)
Prequalification
No
34.Measuring and adjusting the cadastral map (Section through Tam Xuan commune, Tam Anh commune and Tam Hai commune)
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Measuring and adjusting the cadastral map (Section through Tam Tien commune, Tam Hai commune, Tam Hoa commune, Nui Thanh district, Quang Nam province (now Tam Xuan commune, Tam Anh commune, Tam Hai commune, Da Nang city)
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No
35.Consulting, supervision, inspection, measurement and correction of cadastral maps (sections through Tam Xuan commune, Tam Anh commune and Tam Hai commune)
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on supervision, inspection, measurement and correction of cadastral maps (Section through Tam Tien commune, Tam Hai commune, Tam Hoa commune, Nui Thanh district, Quang Nam province (now Tam Xuan commune, Tam Anh commune, Tam Hai commune, Da Nang city)
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location
Implementation location (After merge)
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan for the Integrated Adaptive Development project in Quang Nam province". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email