Bidder Selection Plan

Contractor selection plan for the project: Completing and developing the low voltage station network in Binh Hung Hoa B, Binh Tri Dong, Binh Tri Dong A Wards, Binh Tan District in 2026

  Watching      
Find: 10:42 07/05/2026
Contractor Selection Plan ID
PL2600115519-00
Publishing time
10:35 07/05/2026
Posting Status
Published
Contractor selection plan name
Contractor selection plan for the project: Completing and developing the low voltage station network in Binh Hung Hoa B, Binh Tri Dong, Binh Tri Dong A Wards, Binh Tan District in 2026
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500031639-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
365 Date
Authority that issues the decision
CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC THÀNH PHỐ HỒ CHÍ MINH TNHH - CÔNG TY ĐIỆN LỰC BÌNH PHÚ
Approval date
07/05/2026
Approval ID
1065/QĐ-PCBP
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 4
1.Civil Works
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Pulling a new single-circuit medium voltage line 3ACV95mm² - b22kV+AC50 mm², single line length: 681 meters. - Newly planted 02 double reinforced concrete pillars 14 meters 8.5kN type 2 sections + Concrete foundation poured on site. - Newly planted 11 14-meter double concrete concrete pillars of 8.5kN+ Poured-in-place concrete foundation. - Newly planted 10 single 14-meter 8.5kN concrete concrete pillars + Poured-in-place concrete foundation. - Newly pulled ABC 4x95 mm2 low-voltage line, cable length used: 41,550 meters. - Replace electrical wire branch 2*6mm2 total length: 26,753 meters. - Replace quaduplex 4x22 electrical wiring branch, total length: 2,411 meters. - Newly planted 02 double concrete concrete pillars of 10 meters 5.0kN + Concrete foundation poured on site. - New planting of 56 single 10 meter 5.0kN concrete concrete pillars + Poured-in-place concrete foundation. - Newly planted 03 double reinforced concrete pillars 8.0 meters 3.0kN type 2 sections + Concrete foundation poured on site. - Newly planted 10 single concrete concrete pillars 8.0 meters 3.0kN type 2 sections + Concrete foundation poured on site. - Newly planted 39 single concrete concrete pillars of 8.5 meters 3.0kN+ Poured-in-place concrete foundation.
Capital source details
DTXD
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
Fixed unit price
Implementation location (After merge)
Prequalification
No
2.Construction of installation (Live Line part)
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Install double 14m 8.5kN 2-section pillars using the live line method: 2 pillars - Installing 24kV double vertical ceramics using the live line method: 15 pieces - Installing 24kV single vertical ceramics using the live line method: 4 pieces - Installing porcelain hanging on iron beams using the live line method: 51 sets
Capital source details
DTXD
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
Fixed unit price
Implementation location (After merge)
Prequalification
No
3.Testing equipment and equipment
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Valve lightning protection experiment with rated voltage ≤ 35kV - t/h TN 1-phase valve lightning arrester with number of elements greater than 3: 1 set - Surge protection valve test with rated voltage ≤ 35kV - from the 2nd set of 3 1-phase sets: 26 sets - Testing of mechanically operated isolators, voltage <= 35kV - t/h TN devices 3-phase high-voltage fuses and 3-phase self-falling fuses (FCO, LBFCO): 27 sets - Test circuit breaker and magnetic starter, current 100 ≤ A < 300: 510 pieces - Test circuit breaker and magnetic starter, current 300 ≤ A < 500: 18 pieces - Test circuit breaker and magnetic starter, current 500 ≤ A < 1000: 59 pieces - Test circuit breaker and magnetic starter, current 1000 ≤ A < 2000: 8 pieces - Power cable experiment, voltage ≤1000V, phase 1 (≤ 50m): 7 fibers - Testing Power cable, voltage ≤1000V, phase 2,3 (≤ 50m): 14 fibers - Power cable experiment, voltage ≤1000V, phase 1 (>50m): 3 fibers - Testing Power cable, voltage ≤1000V, phase 2,3 (>50m): 6 fibers
Capital source details
DTXD
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
Fixed unit price
Implementation location (After merge)
Prequalification
No
4.Supervision consultancy
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Construction supervision - Monitoring and installing equipment
Capital source details
DTXD
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Implementation location (After merge)
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan for the project: Completing and developing the low voltage station network in Binh Hung Hoa B, Binh Tri Dong, Binh Tri Dong A Wards, Binh Tan District in 2026". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan for the project: Completing and developing the low voltage station network in Binh Hung Hoa B, Binh Tri Dong, Binh Tri Dong A Wards, Binh Tan District in 2026" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 13

You did not use the site, Click here to remain logged. Timeout: 60 second