Bidder Selection Plan

Contractor selection plan (phase 1) Project: Equipment of lightning protection valve Prevention of 110kV or less voltage levels or less at 220kV, 500kV TBA, managed by the electricity transmission company 2

  Watching      
Find: 08:00 11/09/2025
Contractor Selection Plan ID
PL2500217073-00
Publishing time
07:59 11/09/2025
Posting Status
Published
Contractor selection plan name
Contractor selection plan (phase 1) Project: Equipment of lightning protection valve Prevention of 110kV or less voltage levels or less at 220kV, 500kV TBA, managed by the electricity transmission company 2
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500061296-00
Spending Category
Investment and Development Spending
Authority that issues the decision
Công ty Truyền tải điện 2
Approval date
10/09/2025
Approval ID
2329/QĐ-PTC2
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 2
1.Package 1: Providing consulting services for making construction and construction management; Making TKBVTC - TDT, preparing Bidding Documents; Project: Equipped with lightning resistance of 110kV or less voltage departs at 220kV and 500kV TBAs, which are managed by electricity transmission company 2
Tender/ Prequalification Notice ID
Contract execution period
22 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
1. Carrying out the survey for the establishment 2. Performing the work of formulation 3. Implementation of TKBVTC-TDT, 4. Making Bidding Documents 5. Implementing the legal and specialized agreement of the project
Capital source details
Own capital of EVNNPT
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
2.Package 2: Provide consulting services for verification of the BCNCKT, TKBVTC-TDT; Project: Equipped with lightning protection valve from 110kV or less voltage supply compartments at 220kV, 500kV TBAs, managed by the electricity transmission company 2
Tender/ Prequalification Notice ID
Contract execution period
14 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
1. 2. Implementing the examination of TKBVTC; 3. Implementing the verification of construction construction
Capital source details
Own capital of EVNNPT
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan (phase 1) Project: Equipment of lightning protection valve Prevention of 110kV or less voltage levels or less at 220kV, 500kV TBA, managed by the electricity transmission company 2". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan (phase 1) Project: Equipment of lightning protection valve Prevention of 110kV or less voltage levels or less at 220kV, 500kV TBA, managed by the electricity transmission company 2" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 19

You did not use the site, Click here to remain logged. Timeout: 60 second