Bidder Selection Plan

Contractor selection plan (phase 1) - Tri An Hydroelectric Plant Expansion Project

  Watching      
Find: 12:00 29/09/2023
Contractor Selection Plan ID
PL2300178584-00
Publishing time
11:27 29/09/2023
Posting Status
Published
Contractor selection plan name
Contractor selection plan (phase 1) - Tri An Hydroelectric Plant Expansion Project
Investment objective
- Increase the ability to mobilize capacity for load in the Southern region, especially during peak hours; contributing to reducing production costs of the National electricity system. - Maximize the use of excess water discharged every year during the flood season of the existing Tri An Hydropower Plant to generate electricity, increasing the average annual electricity output by about 113.1 million kWh/year. - Increase frequency regulation and compensation capacity for the plant; Reduce the working intensity of the existing Tri An Hydropower Plant's power units, saving maintenance and repair costs.
Project management forms
BQLDA major - area
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2300047000-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group A
Project implementation time
4 Years
Authority that issues the decision
Tập đoàn Điện lực Việt Nam
Approval date
26/09/2023
Approval ID
106/QĐ-HĐTV
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 6
1.Package TV06-TAMR: Survey consulting, technical design and physical protection design (2-step and 3-step design), preparation of bidding documents
Tender/ Prequalification Notice ID
Contract execution period
49 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Self-arranged capital by the investor and commercial loan capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
October, 2023
Type of contract
Package and Fixed Price
Prequalification
No
Implementation location
2.Package TV09-TAMR: Consultancy and verification of the design of physical protection and construction estimates of Hieu Liem bridge
Tender/ Prequalification Notice ID
Contract execution period
2 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Self-arranged capital by the investor and commercial loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
February 2024
Type of contract
All in One
Prequalification
No
Implementation location
3.Package XL01-TAMR: Construction of clearance and disposal of bombs, mines and explosives
Tender/ Prequalification Notice ID
Contract execution period
3 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Self-arranged capital by the investor and commercial loan capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
January 2024
Type of contract
All in One
Prequalification
No
Implementation location
4.Package TV07-TAMR: Consulting on technical design verification and physical protection design (2-step design)
Tender/ Prequalification Notice ID
Contract execution period
4 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Self-arranged capital by the investor and commercial loan capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
February 2024
Type of contract
All in One
Prequalification
No
Implementation location
5.Package TV10-TAMR: Consulting on surveying, preparing technical plans and supervising construction of mine, mine and explosive material detection and disposal
Tender/ Prequalification Notice ID
Contract execution period
7 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Self-arranged capital by the investor and commercial loan capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
October, 2023
Type of contract
All in One
Prequalification
No
Implementation location
6.Package TV08-TAMR: Survey consulting, design of physical protection and construction estimates, preparation of bidding documents for construction and installation of Hieu Liem bridge
Tender/ Prequalification Notice ID
Contract execution period
21 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Self-arranged capital by the investor and commercial loan capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
October, 2023
Type of contract
Package and Fixed Price
Prequalification
No
Implementation location

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan (phase 1) - Tri An Hydroelectric Plant Expansion Project". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan (phase 1) - Tri An Hydroelectric Plant Expansion Project" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 309

You did not use the site, Click here to remain logged. Timeout: 60 second