Hội đồng quản trị Công ty cổ phần Đầu tư phát triển nhà HUD2
Approval date
03/07/2026
Approval ID
54/QĐ-HĐQT
Approval Documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register
54-QĐ-HĐQT.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements
- Change:Publication date, Bidding package information (View changes)
1.XL1: Ground Leveling Construction, Roads, Rainwater Drainage, Wastewater Drainage, Traffic Ensuring and Construction of Green Tree System, Garden, Landscape
Ground Leveling Construction, Roads, Rainwater Drainage, Wastewater Drainage, Traffic Ensuring and Construction of Green Tree System, Garden, Landscape
Capital source details
Investor's own capital, credit loans and other legally mobilized capital sources
2.XL2: Construction and installation of power supply equipment: Transformer station, medium voltage power, low voltage power, lighting power and electrical testing
Construction and installation of power supply equipment: Transformer station, medium voltage power, low voltage power, lighting power and electrical testing
Capital source details
Investor's own capital, credit loans and other legally mobilized capital sources
4.XL4: Construction of the Wastewater Treatment Station and installation of technological equipment for the Wastewater Treatment Station (excluding greenery and environmental licensing and trial operation)
Construction of the Wastewater Treatment Station and installation of technological equipment for the Wastewater Treatment Station (excluding greenery and environmental licensing and trial operation)
Capital source details
Investor's own capital, credit loans and other legally mobilized capital sources
6.XL6: Construction of trees, gardens, landscape systems (the volume of trees and play area equipment) and the volume of trees in the wastewater treatment station
Construction of trees, gardens, landscape systems (the volume of trees and play area equipment) and the volume of trees in the wastewater treatment station
Capital source details
Investor's own capital, credit loans and other legally mobilized capital sources
9.TV10: Consulting on determining field boundaries of land plots (including preparing measurement documents and adjusting cadastral maps; preparing technical documents of land plots; establishing boundary markers for all land plots)
Consulting on determining field boundaries of land lots (including preparing measurement documents and cadastral map corrections; preparing technical documents of land plots; establishing boundary markers for all land lots)
Capital source details
Investor's own capital, credit loans and other legally mobilized capital sources
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "CONTRACTOR SELECTION PLAN (PHASE 2)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "CONTRACTOR SELECTION PLAN (PHASE 2)" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.