Bidder Selection Plan

Contractor selection plan (Phase 2) - Lao Bao 500kV Transformer Station Project (Huong Hoa) and 220kV connecting line

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 21:16 31/12/2025
Contractor Selection Plan ID
PL2500374730-00
Publishing time
14:35 31/12/2025
Posting Status
Published
Contractor selection plan name
Contractor selection plan (Phase 2) - Lao Bao 500kV Transformer Station Project (Huong Hoa) and 220kV connecting line
Investment objective
- Release the capacity of renewable energy projects in Quang Tri province and in the region to the National Power System. -Provision for importing electricity from Laos. - Ensure long-term, stable and reliable electricity supply for socio-economic development in the region. - Reduce power system losses, improve reliability in transmission system operation.
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500073726-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
18 Month
Authority that issues the decision
TẬP ĐOÀN ĐIỆN LỰC VIỆT NAM
Approval date
31/12/2025
Approval ID
1846/QĐ-EVN
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 2
1.3TV-TBA500LB: Survey consulting, technical design - estimates, construction drawing design, bidding documents and specialized agreements
Tender/ Prequalification Notice ID
Contract execution period
21 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Construction survey to serve technical design. - Prepare technical designs - estimates, design construction drawings, bidding documents, evaluate bids and specialized agreements. - Building information modeling (BIM) for the technical design and construction drawing design stages.
Capital source details
EVN's own capital, domestic commercial credit loans
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
Package and Fixed Price
Prequalification
No
Implementation location (After merge)
2.4TV-TBA500LB: Consulting on technical design verification - estimates, construction drawing design
Tender/ Prequalification Notice ID
Contract execution period
21 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verification of technical design - estimates, construction drawing design; Verify the building information model (BIM) stage of technical design and construction drawing design.
Capital source details
EVN's own capital, domestic commercial credit loans
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan (Phase 2) - Lao Bao 500kV Transformer Station Project (Huong Hoa) and 220kV connecting line". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan (Phase 2) - Lao Bao 500kV Transformer Station Project (Huong Hoa) and 220kV connecting line" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 3

You did not use the site, Click here to remain logged. Timeout: 60 second