contractor selection plan (phase 5) for the project: Anti-erosion embankment on the left bank of Ban Thach river, section from Phu Da to Ban Thach bridge, Dong Hoa town
contractor selection plan (phase 5) for the project: Anti-erosion embankment on the left bank of Ban Thach river, section from Phu Da to Ban Thach bridge, Dong Hoa town
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
2021.12.1 QD KHLCNT 1738 ke ban thach.pdf
List of Bid:
Number of packages: 4
1.Tender package No 18TV: Environmental monitoring and monitoring (additional part)
Open bidding, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2021
Contract Type
According to the adjusted unit price
Prequalification
No
Location
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "contractor selection plan (phase 5) for the project: Anti-erosion embankment on the left bank of Ban Thach river, section from Phu Da to Ban Thach bridge, Dong Hoa town". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "contractor selection plan (phase 5) for the project: Anti-erosion embankment on the left bank of Ban Thach river, section from Phu Da to Ban Thach bridge, Dong Hoa town" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.