Bidder Selection Plan

Contractor selection plan prepared to prepare construction drawing design - construction estimate (phase 1) under the project: Construction of technical infrastructure for land use rights auction area combined with synchronous completion of technical infrastructure in Bai Kinh area, Dong Anh town and Uy No commune, Dong Anh district

  Watching      
Find: 16:48 12/11/2024
Contractor Selection Plan ID
PL2400269016-00
Publishing time
16:48 12/11/2024
Posting Status
Published
Contractor selection plan name
Contractor selection plan prepared to prepare construction drawing design - construction estimate (phase 1) under the project: Construction of technical infrastructure for land use rights auction area combined with synchronous completion of technical infrastructure in Bai Kinh area, Dong Anh town and Uy No commune, Dong Anh district
Investment objective
- Complete connection of technical infrastructure according to the planned plot approved by the competent authority; - Create civilized and modern residential and urban areas, meeting the residential land needs of local and neighboring people; - Overcome the phenomenon of encroachment on public land and illegal land use;
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2400067867-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
4 Years
Authority that issues the decision
UBND huyện Đông Anh
Approval date
12/11/2024
Approval ID
11536/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 8
1.Tender package No 1: Consulting, surveying, designing construction drawings
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Topographical survey for construction drawing design
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Đông Anh District, Hà Nội
Implementation location (Before merge)
Ha Noi city
2.Tender package No 2: Consulting and supervision of survey work and construction drawing design steps
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting and supervising topographic surveys during the design phase of physical protection
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Đông Anh District, Hà Nội
Implementation location (Before merge)
Ha Noi city
3.Bidding package No. 3: Consulting on preparing bidding documents, evaluating bidding documents for construction drawing design bidding packages
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare bidding documents, evaluate bidding documents for construction drawing design consulting package (phase 1)
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Đông Anh District, Hà Nội
Implementation location (Before merge)
Ha Noi city
4.Bidding package No. 4: Consulting on appraisal of bidding documents, appraisal of contractor selection results for construction drawing design bidding package
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Appraisal of bidding documents, appraisal of QLCNT results for construction drawing design consultancy bidding package (phase 1)
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Đông Anh District, Hà Nội
Implementation location (Before merge)
Ha Noi city
5.Tender package No 5: Construction drawing design consultancy
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Organize the preparation of construction drawing designs and construction estimates (phase 1)
Capital source details
District budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Đông Anh District, Hà Nội
Implementation location (Before merge)
Ha Noi city
6.Package 6: Consultancy and verification of construction drawing design - cost estimate
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Organize the verification of construction drawing designs and construction estimates
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Đông Anh District, Hà Nội
Implementation location (Before merge)
Ha Noi city
7.Tender package No 7: Valuation consultancy
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Appraisal of prices of materials and machine shifts that are not included in the price announcements of specialized Departments and Committees (phase 1)
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Đông Anh District, Hà Nội
Implementation location (Before merge)
Ha Noi city
8.Tender package No 8: Consulting on landmark installation to serve site clearance work
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Installing handover boundary markers to serve site clearance work
Capital source details
District budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Đông Anh District, Hà Nội
Implementation location (Before merge)
Ha Noi city

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan prepared to prepare construction drawing design - construction estimate (phase 1) under the project: Construction of technical infrastructure for land use rights auction area combined with synchronous completion of technical infrastructure in Bai Kinh area, Dong Anh town and Uy No commune, Dong Anh district". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan prepared to prepare construction drawing design - construction estimate (phase 1) under the project: Construction of technical infrastructure for land use rights auction area combined with synchronous completion of technical infrastructure in Bai Kinh area, Dong Anh town and Uy No commune, Dong Anh district" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 22

You did not use the site, Click here to remain logged. Timeout: 60 second