Bidder Selection Plan

Contractor selection plan Project: Equipping a relay system that complies with distribution power system regulations at 110kV transformer stations An Long, Tran Quoc Toan, An Hoa, Thanh Hung, NhaMan and Song Hau according to Project 100

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 09:09 09/10/2025
Contractor Selection Plan ID
PL2500011305-01
Publishing time
09:07 09/10/2025
Posting Status
Published
Contractor selection plan name
Contractor selection plan Project: Equipping a relay system that complies with distribution power system regulations at 110kV transformer stations An Long, Tran Quoc Toan, An Hoa, Thanh Hung, NhaMan and Song Hau according to Project 100
Bid Solicitor
Investor
Name of project
Equipped with relay systems that comply with distribution power system regulations at 110kV substations of An Long, Tran Quoc Toan, An Hoa, Thanh Hung, NhaMan and Song Hau according to Project 100
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Other
Authority that issues the decision
Công ty Điện lực Đồng Tháp
Approval date
14/01/2025
Approval ID
96/QĐ-PCĐT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 3
1.Package 10: Installation, testing, equipment calibration and configuration, checking project SCADA signals Equipping a relay system that complies with distribution power system regulations at 110kV transformer stations An Long, Tran Quoc Toan, An Hoa, Thanh Hung, Nha Man and Song Hau according to Project 100
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Organize installation, testing, equipment calibration and configuration, and check SCADA signals according to current regulations
Capital source details
Commercial loan capital and capital amortization capital (KHCB) of the Southern Power Corporation
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
Is different
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Đồng Tháp
2.Contract package: Consulting on construction supervision and installation of construction equipment Equipping relay systems in compliance with distribution power system regulations at 110kV transformer stations An Long, Tran Quoc Toan, An Hoa, Thanh Hung, Nha Man and Song Hau according to Project 100
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Organize construction supervision and installation of construction materials and equipment according to current regulations
Capital source details
Commercial loan capital and capital amortization capital (KHCB) of the Southern Power Corporation
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Đồng Tháp
3.Package 10.1: Construction and installation of construction equipment Equipping a relay system that complies with distribution power system regulations at 110kV transformer stations An Long, Tran Quoc Toan, An Hoa, Thanh Hung, Nha Man and Song Hau according to Project 100 (including calculation of protective relay adjustment parameters)
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction, equipment installation and calculation of protective relay parameters
Capital source details
Commercial loan capital and capital amortization capital (KHCB) of the Southern Power Corporation
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Đồng Tháp

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan Project: Equipping a relay system that complies with distribution power system regulations at 110kV transformer stations An Long, Tran Quoc Toan, An Hoa, Thanh Hung, NhaMan and Song Hau according to Project 100". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan Project: Equipping a relay system that complies with distribution power system regulations at 110kV transformer stations An Long, Tran Quoc Toan, An Hoa, Thanh Hung, NhaMan and Song Hau according to Project 100" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 10

You did not use the site, Click here to remain logged. Timeout: 60 second