Bidder Selection Plan

Contractor selection plan - Project exploitation is below -220 Binh Minh mine

  Watching      
Find: 13:03 08/08/2024
Contractor Selection Plan ID
PL2300097055-01
Publishing time
08:32 08/08/2024
Posting Status
Published
Contractor selection plan name
Contractor selection plan - Project exploitation is below -220 Binh Minh mine
Investment objective
Maintain the output of pit coal mining and stable jobs of Hon Gai Coal Company - TKV, meeting the needs of coal of the national economy, contributing to the implementation of the development goal of Vietnam's coal industry.
Project management forms
BQLDA major - area
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2300026611-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
4 Years
Authority that issues the decision
Hội đồng thành viên Tập đoàn Công nghiệp Than - Khoáng sản Việt Nam
Approval date
05/08/2024
Approval ID
Số 1406/QĐ-TKV
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Filter name, Total investment, Decision-making agency, Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 39
1.Tender package No 1: Building underground, clear and prepared furnace lines
Tender/ Prequalification Notice ID
Contract execution period
36 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
According to adjusted unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
2.Package 2: Building a water supply pipe in the furnace
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a. Construction cost b. Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
3.Package 3: Building water supply pipes in the furnace
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a. Construction cost b. Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
According to adjusted unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
4.Tender package No 4: Building air supply pipes
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a. Construction cost b. Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
According to adjusted unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
5.Tender package No 5: Supply equipment, construction and installation of automatic pump automatic system -350
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a, Construction costs, equipment - The construction part in the furnace and outside the ground; - Equipment part: + The center control cabinet full of explosive rooms (01 piece); + Local control cabinet for each explosive room pump (03 pieces); + Local control cabinets for fading door valves, explosive room types (01 piece); + Local control cabinets for flooding and fire -proof door systems (01 pieces); + Equipment for opening and closing anti -flooding, fire control electricity - Explosion room compressed air; U = 660V (02 sets); + The device warns the full set with sound and light, the type of room voltage explosion 127VAC (05 pieces); + The positive pressure sensor explosion, the protective form of the Exdi explosion room, the minimum protection of the shell ip54 (03 pieces); + The sound pressure sensor exploded, the protective room of the Exdi explosion, the minimum protection of the case IP54 (03 pieces); + Sensor measuring the water level of explosive room type (03 pieces); + The traffic measurement sensor (02 pieces); + Explosive temperature sensor (06 pieces); + Explosive room camera (05 pieces); + Cabinet collection and processing of complete central data (01 piece); + Equipment installation costs; + Adjustable experiment; + Equipment installation costs. b, Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
6.Package 6: Building a system of electricity supply in the furnace, central power station of -350, transportation through wells and transportation in the furnace
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a, Construction cost - Providing electricity in the furnace (01HT); - Central power stations of -350 (01HT); - Transport via well (01 HT); - Transport in the furnace (01 HT). b, Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
According to adjusted unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
7.Tender package No 7: Building communication system
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a. Construction cost b. Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
8.Bidding package 8: Providing equipment and building a monitoring and warning system
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a, Construction costs, equipment - Construction part - Equipment part: + CPRC-1/F, (0-:-10) KPA (synchronously the power cord) (01 set); + Power-cutting copper (Cat-1PN) U = (127/ 660V)/ 18V (01 set); + Equipment installation costs (01 HT); + Adjustable experiment (01 HT). b, Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
9.Tender package No 9: Supply equipment, build and install surveillance camera system, automation system to concentrate transportation in the furnace, automation of fan station
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a, Construction costs, equipment * Building part: - Surveillance camera system (01 HT); - Automation system - Control system of transportation in the furnace, fan station (01 HT). * Equipment section - Industrial surveillance camera system: + One -way voltage power stabilizer U = 12V (DC); I = 520mA (10 pieces); + Optical cable cutting tool (01 set); + Optical reflection machine over time (01 piece); + Specialized tools (05 sets); - Automation system - Control control system in the furnace: + Software surveillance and control software (new upgrade) (01 HT); - Automation system - Automation of fan station: + Industrial computer full set Simatic IPC347E (01 set); + 21.5 LCD computer screen (01 pieces); + The screen of the person - HMI (02 pieces); + 55inch LCD screen (01 piece); + 16 -channel architect recorder (01 piece); + A4 printer (01 piece); + UPS Online 2000VA saved 1 hour (01 piece); + Control isolation transformer 500VA (02 pieces); + Windows Windows software Win10 Professional (01 set); + SQL Microsoft SQL Server database management software (01 set); + WinCC 128k software Tag Siemens Simatic WinCC copyright (01 set); + Software to monitor and control the centralized control software system using the interface in Vietnamese (01 pack); + 4 -port industrial network switch (02 pieces); + CXRXS electrical cabinet: 2200x700x600mm (01 piece); + PLC controller S7-1500 (02 sets); + Intermediate control relay 2 pole U = 220V (20 sets); + Atomat control 2 phase 10A (08 pieces); + 5A protection fuse (10 pieces); + Lightning protection source (03 sets); + The explosive wind speed measuring head (01 piece); + Explosive room lowering head (01 piece); + Hydraulic brake braking, controlled (2 sets); + Automatic wind door cruise sensor (16 sets); + Room IP Camera exploded U = 127V; I = 250mA (03 pieces); - Equipment installation costs b, Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
10.Package 10: Installing railway on the ground
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a. Construction cost b. Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
According to adjusted unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
11.Tender package No 11: Building a house to cover the mouth of the well, axis house, transformer station and Quang flip station
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a, Construction cost - The house covers the mouth of the well (01 Hm); - Shaft winch (01 Hm); - KIOS transformer station (01 Hm); - Optical station (01 Hm). b, Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
12.Tender package No 12: Building water supply pipes on SCN+25 and external power supply systems
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a. Construction cost b. Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
According to adjusted unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
13.Package 13: Building a fire protection system on the ground
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
14.Tender package No 14: Building pumped pipeline pipes
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a, Construction cost b, Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
15.Tender package No 15: Provide mechanical market furnace equipment
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a, Equipment cost - Coal maker: Discount height 1.4 ÷ 3.2m; Step 0.63m, the slope of the market is up to 35 degrees; Fkéo = 223 ÷ 203kn (01 set); - Anti -intermediate rig: height 1500 ÷ 2400mm; Market slope angle ≤ 35 degrees; Moving step 630mm; FLV = 3000KN (94 sets); - Excessive anti -excessive rig: height 900 ÷ 3100mm; Market slope angle ≤ 35 degrees; Moving step 630mm; FLV = 3200KN (06 sets); - Single hydraulic column: 300kn working pressure, lowest tension 115 ÷ 157kn; The maximum height of 2200 mm; The journey of 800mm (264 pieces); - Single hydraulic column DZ-25; 250kn (100 pieces); - Box: l = 4,400mm (22 pieces); - 200/ 31.5MPa emulsion pumping stations, p = 132kw. U = 660/1140V (01 station); - Misting pumping station and pipeline system: 31.5MPa pressure; flow of 200L/min (01 station); - Explosive room crusher: Q = 500T/h; P = 75kW. U = 660/1140V (01 pieces); - Machine transfer: Q = 500T/h; P = 110kW; L = 35m, u = 660/1140V (01 set); - Rake trough (mirror): Q = 400T/h; P = 2x110kw (01 set); - Rake trough (recovery): q = 400t/h; P = 2x110kw (01 set); - Slow winch: 22kW capacity; The traction from 15 kN to 130KN, the speed of the cable 0.1625 m/s to 1.2m/s (02 sets); - Winning: Traction force: 40 KN; D = 580mm, b = 600mm, p = 55kW (02 sets); - Winning: F = 140 KN; v = 0.11m/s; Cable length: 130m; P = 18.5 kW (01 set); - Electrical Pa Lang 5T: U = 380/660V; P = 750W; H = 5m (01 pieces). b, Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
16.Tender package No 16: Supply conveyor in the furnace
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a, Equipment cost -LC BM-5-1 Transport Belts (BT01); Q = 120t/h; B = 0.65m; L = 360m; v = 2.0m/s; P = 45kW; U = 660V (01 set); -LC BM-5-1 Transport Belts (BT02); Q = 120t/h; B = 0.65m; L = 310m; v = 2.0m/s; P = 37KW; U = 660V (01 set); -LC BM-5-1 Transport Conveyor (BT03); Q = 120t/h; B = 0.65m; L = 135m; v = 2.0m/s; P = 18.5kW; U = 660V (01 set); -LC BM-5-3 transport furnace conveyor (BT04); Q = 120t/h; B = 0.65m; L = 215m; v = 2.0m/s; P = 30kW; U = 660V (01 set); -LC BM-5-3 transport furnace conveyor (BT05); Q = 120t/h; B = 0.65m; L = 145m; v = 2.0m/s; P = 18.5kW; U = 660V (01 set); -LC BM-5-3 transport furnace conveyor (BT06); Q = 120t/h; B = 0.65m; L = 295m; v = 2.0m/s; P = 37KW; U = 660V (01 set); -Transportation conveyor of -232 ÷ -230 v5 (BT07); Q = 120t/h; B = 0.65m; L = 95m; v = 2.0m/s; P = 18.5kW; U = 660V (01 set); -Conveyor LC BM-5-6 (BT08); Q = 120t/h; B = 0.65m; L = 105m; v = 2.0m/s; P = 18.5kW; U = 660V (01 set); -Conveyor LC BM-5-6 (BT09); Q = 120t/h; B = 0.65m; L = 100m; v = 2.0m/s; P = 18.5kW; U = 660V (01 set); -Transportation conveyor -298 ÷ ​​-220 V5 (BT10); Q = 120t/h; B = 0.65m; L = 265m; v = 2.0m/s; P = 75kW; U = 660V (01 set); - Conveyor stations along coal seams level -298 (BT11); Q = 240t/h; B = 0.8m; L = 60m; v = 2.0m/s; P = 18.5kW; U = 660V (01 set); - The conveyor belt is -220 (BT13); Q = 240t/h; B = 0.8m; L = 60m; v = 2.0m/s; P = 18.5kW; U = 660V (01 set). b, Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
17.Tender package No 17: Supplying troughs in the furnace
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a, Equipment cost - SGB520/40T scratch trough; L = 100m; Qmax = 120t/h; P = 40kW; U = 660V (02 sets). b, Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
18.Package 18: Supply and install the Monoray system (using diesel oil)
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a, Equipment cost - Monoray system (using diesel oil), traction f = 210 kN, speed v = 2.5m/s, transport length l = 1000 m full set (01 ht). b, Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
19.Tender package No 19: Supply and install pump tunnel equipment at -350
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a, Equipment cost -Multi-level explosive centrifugal pumps with electric motor and pedestal Q = 680m3/h, HD = 528-480-432M, HH = 5.5-4.5-3.5m, P = 1400kW, U = 6KV, N = 1480 rpm (03 pieces); - Electrical control valve with type of Axide DN300, PN60AT, installation length l = 750mm (03 pieces); - Electrical control valve with DN300, PN60AT (03 pieces); - DN300, PN60AT valve with a valve with touch devices (03 pieces); -PMAX pressure gauge = 60AT, type of electrical contact 4-:-20mA, 1-:-10V (03 pieces); -PMAX vacuum pressure gauge = 1at, electrical contact type 4-:-20mA, 1-:-10V (03 pieces); - Integrated submersible pump (bait pump) q = 35m3/h, thrust pressure h = 70mh2O, p = 5.5kw, u = 660V (03 pieces); - D1000, pn6at, p = 1.5kw, u = 660V (03 pieces); - Hand -pulling roller pl = 10 tons, h = 5m (02 pieces); - Hand -pulling roller pl = 3.2 tons, h = 5m (02 pieces) - Equipment installation costs b, Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
20.Tender package No 20: Supply and installation of power station equipment of -350
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a, Equipment cost - 6KV cutting machine 400A explosion (type of cable input cabinet) The maximum working voltage 7.2kV (01 piece); - 6kV cutting machine 400A explosion (type of cable input cabinet) The maximum working voltage 7.2kV (01 pieces); - 6KV cutting machine 400A explosion (type of segment cabinet) The maximum working voltage 7.2kV (01 pc); - 6 kV cutting machine 200A explosion; The maximum working voltage is 7.2kV (09 pieces); - Soft boot 6kV explosion room; The maximum working voltage 7.2kV, I = 250A, P = 1400 kW (03 pieces); - Mobile transformer station exploded 6/0.69kV 200kVA (01 pieces); - Pressure cool room I = 400A; U = 660V (04 pieces); - Start from the explosion room I = 30A u = 660V (03 pieces); - Room light transformer with da dumpling = 660/133V, SĐM = 4KVA (01 pieces); - Equipment installation costs; - Adjustable experiment; b, Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
21.Tender package No 21: Providing electrical supply system equipment in the furnace
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a, Equipment cost - Mobile transformer station exploded 6/1.14kV-1600KVA (01 pieces); - Mobile transformer station exploded 6/0.69kV- 630kva (01 pieces); - Mobile transformer station exploded 6/0.69kV-400KVA (01 pieces); - Hall of a bridge breaker with an explosive room 02 exposed: rated voltage of 1140/660V, rated current 1200A; 12 revealed (01 cabinet); - A cooling room to explode I = 400A, U = 660V (04 pieces); - A cooling room to explode I = 200A, U = 660V (33 pieces); - Start from the explosion room I = 80A. U = 660V (25 pieces); - Start from the explosion room I = 30A. U = 660V (03 pieces); - Start from the explosion room I = 80A. U = 660V (02 pieces); - Room lighting transformer with dm = 660/133V, SĐM = 4KVA (09 pieces); - Room light transformer with dm = 660/133V, SĐM = 4KVA (05 pieces); b, Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
22.Tender package No 22: Supplying a shaft axa auxiliary level +25 -: --350
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a, Equipment cost - Machine 1 tang d = 2.5m; B = 2m; F = 90kn; Vmax = 4.7m/s; P = 500KW, U = 6KV, Full set of control equipment (01 set); - Pa Lang hand q = 10t (01 piece); - Winding to prescription f = 10kn; v = 0.37m/s; P = 11.4kw; U = 660V (02 pieces); - Set the head axis, axis (02 pieces); - Safety orange against speeding (04 pieces); - Toad of mound (02 pieces); - Cable support roller diameter d = 245mm, l = 300mm (06 pieces); - Cable support with diameter d = 133mm, l = 300mm (95 pieces); - Cable support with diameter d = 159mm, l = 300mm (02 pieces); - Cable support with diameter c = 245mm, l = 1200mm (01 pc). b, Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
23.Package 23: Provide explosive room conveyor and underground transport machine level -220 ÷ -367
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a, Equipment cost -Underground PN conveyor -220 ÷ -367; Q = 240t/h; B = 0.8m; L = 547m; v = 2m/s; P = 220kW; U = 660V (01 set); - Issuing explosive room in furnace q = (150-200) t/h; P = 8KW; U = 660V (01 pieces); - Hand -pulling chain broadcasting 7.5T (02 pieces); - Water pump PN q = 16m3/h; H = 50m; P = 4KW; U = 660V (02 pieces). b, Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
24.Tender package No 24: Providing a manager of the room to explode underground transporting -220 ÷ -367
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a, Equipment cost - Winding of PN fertilizer wire f = 25kn; P = 40kW; U = 660V (01 set). b, Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
25.Bidding package No. 25: Providing electrical equipment for side tilt and underground conveyor belt
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a, Equipment cost - Cutting machine cabinet revealed Um = 7.2KV; I ĐM = 400A (01 piece); - A cooling room to explode dm = 660V; IDM = 400A (01 pieces); - A cooling room to explode dm = 660V; I ĐM = 200A (01 piece); - Start from the explosion room Um = 660V; IDM = 80A (01 pieces); - Variables for lighting rooms Um = 660/133V, SĐM = 4KVA (01 pieces); - Pressure cool room I = 200A; U = 660V (05 pieces); - Soft booting room explosion voltage rated 660V; Rated current 250A; Protection function: Protection of electricity detection, loss of phase, overload, overflow, unbalanced three -phase, short -circuited, too pressure, low pressure; Starting time: (1-30s); Stop time: (0-30) S, (0-120) S; EXDI explosion protection form, minimum shell protection ip54; RS485 communication portal (01 piece); - Start from the explosion room Um = 660V; I DM = 80A (02 pieces); - Start from the explosion room Um = 660V; I ĐM = 80A (01 piece); - Soft boot room Uđm = 660V; P = 40kW; I = 150A (01 piece); - Room light transformer with da dumpling = 660/133V, SĐM = 4KVA (01 pieces); - Electrical control cabinet center explosive room u = 660V (01 piece); - Electrical control cabinet intermediate room exploding u = 660V (01 piece). b, Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
26.Tender package No 26: Supply and installation of flip -floping stations
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
27.Tender package No 27: Provides a system of dredging of the mud to explode the full set of 50m3/h
Tender/ Prequalification Notice ID
Contract execution period
90 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a, Equipment cost - Increase pump q = 50m3/h; H = 81MH/2O; engine P = 22kW; U = 660V; n = 2900Vg/min (01 pieces); - Ratty speed winch P = 5.5kW; U = 660V; n = 1450Vg/min (08 pieces); - Mobile conveyor B650; L = 16m; P = 15kW; U = 660V; n = 1450Vg/min (01 piece); - KT wave wing sludge juice machine: DXCXR = 3500mm x 2000mm x 2100mm; Q = 37 ÷ 185m3/h; C = 5%÷ 25%; output ratio 95 ÷ 98%; P = 15+3.75kW; U = 660V; SUS 304 stainless steel material (01 piece); - Mud centrifugal pump horizontal horizontal shaft q = 60m3/h; H = 40MH/2O; C/max = 30%; P ≤ 2.7kg/dm3/; Ø <3cm; ' P = 37KW; U = 660V; n = 1450Vg/min (01 piece); - Vehicle carrying 2 tons of equipment; Hydraulic engine; Attach pump fitted frame (01 piece). b, Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
28.Tender package No 28: Installing equipment in the furnace
Tender/ Prequalification Notice ID
Contract execution period
24 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a, Equipment installation costs - Installation of mechanized market furnace equipment (01 HT); - Installation of conveyors in the furnace (01 HT); - Installing and experimenting with adjusting electricity supply systems in the furnace (01 HT); - Installing transport equipment through wells (01 HT). b, Preventive expenses
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
According to adjusted unit price
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
29.Tender package No 29: Making TKKT-TDT
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
30.Package 30: Making TKBVTC-DT
Tender/ Prequalification Notice ID
Contract execution period
30 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
31.Tender package No 31: Verification of TKKT-TDT
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q3 2023
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
32.Tender package No 32: Verification of TKBVTC-DT
Tender/ Prequalification Notice ID
Contract execution period
27 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q3 2023
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
33.Tender package No 33: Set the task of surveying the CCT-CTV
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
34.Bidding package No. 34: Survey drilling DCB
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
35.Tender package No 35: Supervision of drilling and drilling of the CCT-CTV
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2023
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
36.Tender package No 36: Supervising construction in the furnace and outside the ground
Tender/ Prequalification Notice ID
Contract execution period
36 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q3 2023
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
37.Tender package No 37: Supervision of equipment installation and automation systems
Tender/ Prequalification Notice ID
Contract execution period
48 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Monitoring and installing equipment and automation systems
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
38.Tender package No 38: Project audit
Tender/ Prequalification Notice ID
Contract execution period
18 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Completed project audit
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh
39.Tender package No 39: Construction insurance
Tender/ Prequalification Notice ID
Contract execution period
36 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Commercial loans and other legal sources of Hon Gai Coal Company - TKV
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hạ Long City, Quảng Ninh
Implementation location (Before merge)
Tỉnh Quảng Ninh

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan - Project exploitation is below -220 Binh Minh mine". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan - Project exploitation is below -220 Binh Minh mine" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 66

You did not use the site, Click here to remain logged. Timeout: 60 second