Bidder Selection Plan

Contractor selection plan Project: Overload prevention, grid improvement, power loss reduction, medium and low voltage power grid and substation in Phu Ninh area DL Tien Phuoc in 2024

  Watching      
Find: 17:51 18/10/2023
Contractor Selection Plan ID
PL2300195104-00
Publishing time
17:50 18/10/2023
Posting Status
Published
Contractor selection plan name
Contractor selection plan Project: Overload prevention, grid improvement, power loss reduction, medium and low voltage power grid and substation in Phu Ninh area DL Tien Phuoc in 2024
Investment objective
- To improve electricity quality, ensure stable and safe electricity supply to serve local socio-economic development, businesses and people. - Gradually improve and complete the regional power grid: ensure reliability according to the roadmap; Complete the current power grid; Reduce power supply radius, power concave area, rear wire length Households pull meters to use, resolving urgent recommendations of voters, people and local authorities.
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2300051309-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
180 Date
Location
Quang Nam province
Authority that issues the decision
Công ty Điện lực Quảng Nam
Approval date
18/10/2023
Approval ID
5722/QĐ-QNaPC
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 5
1.Tender package No 03/GS: Consulting on construction supervision and installation of construction equipment
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Commercial loan capital and basic depreciation of EVNCPC
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location
2.Tender package No 01/XL: Supply of materials (except level A materials) and construction and installation of the electrical grid of the project.
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Trade and commercial capital of EVNCPC
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location
3.Tender package No 04/GS: Construction supervision consultant for the relocation of the meter
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Commercial loan capital and basic depreciation of EVNCPC
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location
4.Tender package No 05/TN+HL: Testing of materials, equipment and construction Hotline
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Commercial loan capital and basic depreciation of EVNCPC
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location
5.Package 02/XL: Supply of materials (except for A grade materials) and construction and installation of the meter relocation part
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
Commercial loan capital and basic depreciation of EVNCPC.
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan Project: Overload prevention, grid improvement, power loss reduction, medium and low voltage power grid and substation in Phu Ninh area DL Tien Phuoc in 2024". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan Project: Overload prevention, grid improvement, power loss reduction, medium and low voltage power grid and substation in Phu Ninh area DL Tien Phuoc in 2024" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 11

You did not use the site, Click here to remain logged. Timeout: 60 second