Bidder Selection Plan

Contractor selection plan (Project preparation phase)

  Watching  
Project Contractor selection plan Bid award
Find: 13:15 11/08/2026
Contractor Selection Plan ID
PL2600251100-02
Publishing time
09:03 11/08/2026
Posting Status
Published
Contractor selection plan name
Contractor selection plan (Project preparation phase)
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Spending Category
Investment and Development Spending
Authority that issues the decision
CÔNG TY ĐIỆN LỰC THÀNH PHỐ CẦN THƠ
Approval date
08/08/2026
Approval ID
2301/QĐ-PCCT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Lowest bid price, Highest bid price, Publication date (View changes)

- Change: Publication date (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 12
1.Consulting on surveys, preparing feasibility study reports, designing construction drawings and cost estimates for the "Upgrade and Development of the Ninh Kieu Power Grid Area in 2027 - Phase 1" project.
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey consultancy, feasibility study report, construction drawing design and estimation
Capital source details
KHCB
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
According to output
Implementation location
Prequalification
No
2.Consulting on surveys, preparing feasibility study reports, designing construction drawings and cost estimates for the "Upgrade and Development of the Power Distribution Network in the Binh Thuy Area" project (2027).
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey consultancy, feasibility study report, construction drawing design and estimation
Capital source details
KHCB
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
According to output
Implementation location
Prequalification
No
3.Consulting on feasibility studies, preparing research reports, designing construction drawings and cost estimates for the 2027 upgrade and development project of the O Mon power distribution grid.
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey consultancy, feasibility study report, construction drawing design and estimation
Capital source details
KHCB
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
According to output
Implementation location
Prequalification
No
4.Consulting on surveys, preparing feasibility study reports, designing construction drawings and cost estimates for the 2027 upgrade and development project of the Cai Rang power distribution grid.
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Surveying, feasibility study report preparation, construction drawing design and cost estimation.
Capital source details
KHCB
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
According to output
Implementation location
Prequalification
No
5.Consulting on surveys, preparing feasibility study reports, designing construction drawings and cost estimates for the "Upgrade and Development of the Power Distribution Network in the Thot Not Area – Phase 1 (2027)" project.
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey consultancy, feasibility study report, construction drawing design and estimation
Capital source details
KHCB
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
According to output
Implementation location
Prequalification
No
6.Consulting on survey work, preparing a feasibility study report, designing construction drawings and cost estimates for the "Upgrade and Development of the Nghia Gia Power Distribution Network in 2027 - Phase 1" project.
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Surveying, feasibility study report preparation, construction drawing design and cost estimation.
Capital source details
KHCB
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
According to output
Implementation location
Prequalification
No
7.Consulting on surveys, preparing feasibility study reports, designing construction drawings and cost estimates for the "Upgrade and Development of the Distribution Grid in Soc Trang Province - Phase 1" project.
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey consultancy, feasibility study report, construction drawing design and estimation
Capital source details
KHCB
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
According to output
Implementation location
Prequalification
No
8.Consulting on surveys, preparing feasibility study reports, designing construction drawings and cost estimates for the "Upgrade and Development of the Power Distribution Network in the Cao Den Area - Phase 1 (2027)" project.
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey consultancy, feasibility study report, construction drawing design and estimation
Capital source details
KHCB
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
According to output
Implementation location
Prequalification
No
9.Consulting on surveys, preparing feasibility study reports, designing construction drawings and cost estimates for the "Upgrade and Development of the Vị Thanh Distribution Power Grid in 2027 - Phase 1" project.
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey consultancy, feasibility study report, construction drawing design and estimation
Capital source details
KHCB
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
According to output
Implementation location
Prequalification
No
10.Consulting on surveys, preparing feasibility study reports, designing construction drawings and cost estimates for the "Upgrade and Development of the Vĩnh Thạnh Power Grid in 2027" project.
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey consultancy, feasibility study report, construction drawing design and estimation
Capital source details
KHCB
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
According to output
Implementation location
Prequalification
No
11.Consulting on surveys, preparing feasibility study reports, designing construction drawings and cost estimates for the "Upgrade and Development of the Power Distribution Network in Thoi Lai District – Phase 1 (2027)" project.
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey consultancy, feasibility study report, construction drawing design and estimation
Capital source details
KHCB
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
According to output
Implementation location
Prequalification
No
12.Consulting and report preparation for the technical and economic feasibility study of the "Upgrade and Development of the Power Distribution Grid in Phong Dinh District" project (2027).
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey consultancy, feasibility study report, construction drawing design and estimation
Capital source details
KHCB
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
In the third quarter, 2026
Type of contract
According to output
Implementation location
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan (Project preparation phase)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan (Project preparation phase)" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 0

You did not use the site, Click here to remain logged. Timeout: 60 second