Bidder Selection Plan

Contractor selection plan Project: Upgrading and renovating 22kV medium voltage line 472CH/473CH - National Highway 1A from Cai Tac town to Rach Chiec; Construction of a medium-pressure line along National Highway 1A from Cai Tac Junction to Rach Chiec Bridge; Investing in renovating the main medium and low voltage power grid 475CH/473CH section from Chau Thanh 110kV station to Rach Goi intersection of National Highway 61; Upgrade route 479VT to 02 circuits from Vinh Tuong Junction to Cau Xang

  Watching      
Find: 08:19 11/02/2026
Contractor Selection Plan ID
PL2500285766-03
Publishing time
08:18 11/02/2026
Posting Status
Published
Contractor selection plan name
Contractor selection plan Project: Upgrading and renovating 22kV medium voltage line 472CH/473CH - National Highway 1A from Cai Tac town to Rach Chiec; Construction of a medium-pressure line along National Highway 1A from Cai Tac Junction to Rach Chiec Bridge; Investing in renovating the main medium and low voltage power grid 475CH/473CH section from Chau Thanh 110kV station to Rach Goi intersection of National Highway 61; Upgrade route 479VT to 02 circuits from Vinh Tuong Junction to Cau Xang
Investment objective
- Expanding the power grid, improving operating capacity, meeting the speed of load development for key areas in the area. - Exploiting the load of 110/22KV transformer stations inside and outside the province, overcoming the overload of the conductor on the existing routes and reducing the risk of electricity grid incidents - Connect the grid circuit of the ward and surrounding areas (Chau Thanh A, Nga Bay City, Can Tho City). Contribute to improving the reliability of electricity supply.
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500042198-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
2 Years
Authority that issues the decision
Công ty Điện lực TP Cần Thơ
Approval date
11/02/2026
Approval ID
435/QĐ-PCCT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Investor, Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 2
1.Construction and installation projects (No. 1)
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction and installation projects
Capital source details
KHCB, loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
2.Construction supervision and equipment installation supervision (No. 1)
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction supervision and equipment installation and installation
Capital source details
KHCB, loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan Project: Upgrading and renovating 22kV medium voltage line 472CH/473CH - National Highway 1A from Cai Tac town to Rach Chiec; Construction of a medium-pressure line along National Highway 1A from Cai Tac Junction to Rach Chiec Bridge; Investing in renovating the main medium and low voltage power grid 475CH/473CH section from Chau Thanh 110kV station to Rach Goi intersection of National Highway 61; Upgrade route 479VT to 02 circuits from Vinh Tuong Junction to Cau Xang". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan Project: Upgrading and renovating 22kV medium voltage line 472CH/473CH - National Highway 1A from Cai Tac town to Rach Chiec; Construction of a medium-pressure line along National Highway 1A from Cai Tac Junction to Rach Chiec Bridge; Investing in renovating the main medium and low voltage power grid 475CH/473CH section from Chau Thanh 110kV station to Rach Goi intersection of National Highway 61; Upgrade route 479VT to 02 circuits from Vinh Tuong Junction to Cau Xang" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 6

You did not use the site, Click here to remain logged. Timeout: 60 second