Summary of main tasks of the bid package
- Bridge abutments:
+ Reinforced concrete pile foundation (25x25)cm, 8.4m long, 02 piles/abutment, straight.
+ Abutment body, abutment head wall: reinforced concrete, 1x2 stone concrete, M300, poured in place.
- Bridge piers:
+ Reinforced concrete pile foundation (25x25)cm, 15.4m long (including 02 sections 8.4m and 7m), 02 piles/pillars, driven straight.
+ Pillar cap (cap beam): Reinforced concrete, 1x2 stone concrete, M300, poured in place.
- Bridge bearing: Reinforced concrete, 1x2 stone concrete, M300, poured connected to the abutment body and pier cap.
- Edge rhythm, middle rhythm:
+ Bridge deck: Reinforced concrete, 1x2 stone concrete, M300, 10 (cm) thick, poured in place combined with the main beam.
+ Wheel fender: TD (0.12x0.08)m; RC; 1x2 stone concrete, M300, poured in place and integrated with the bridge deck.
+ Longitudinal beams of 02 boundary spans (4 beams): reinforced concrete poured in place, TD (0.2x0.4)m; 4.1m long/beam; The longitudinal beams are fixed with horizontal beams 1,225 (m) long, with cross-section (0.15x0.30)m, reinforced concrete structure, 1x2 stone concrete, M300, poured in place.
+ Mid-span longitudinal beam (02 beams): Cast-in-place reinforced concrete, TD (0.20x0.40)m length 6m/beam, longitudinal beams are fixed with horizontal beams 1.225m long; with cross section (0.15x0.30)m, reinforced concrete structure, 1x2 stone concrete, M300, poured in place.
+ Railing post: TD (0.12x0.12)m, 0.8m high, reinforced concrete, 1x2 stone reinforced concrete, M250, poured in place and combined with wheel guard.
+ Handrail: TD (0.07x0.10)m, reinforced concrete, 1x2 stone reinforced concrete, M250, poured in place and combined with the handrail pillar.
- Install bridge nameplates on both sides of the bridge.
- Road leading to the bridge: Structure made of reinforced concrete (fi6@200 steel), 1x2 stone, M250, 4.2m wide, 16(cm) thick + Rubber lining sheet + CPDD layer 0x4 Type I (Dmax = 25mm), 15cm thick, compaction K>= 0.95 + Additional layer of black sand, average thickness (20 - 22)cm, compaction K>= 0.90 + Surface Current 4.2m wide concrete road.
- Reinforced concrete embankment on both sides of bridge abutment: Reinforced concrete pile (20x20)cm, 8.4m long; Inside, install reinforced concrete panels (1200x600x80)mm to block the soil. Above the surface of the woven panels is a reinforced concrete anchor beam structure (280x200)mm connecting the revetment piles.
(Other details according to the approved construction drawing design documents)