Bidder Selection Plan

Contractor selection plan: Upgrading and expanding Tam Do bridge

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 10:58 06/12/2024
Contractor Selection Plan ID
PL2400304252-00
Publishing time
10:58 06/12/2024
Posting Status
Published
Contractor selection plan name
Contractor selection plan: Upgrading and expanding Tam Do bridge
Name of project
Upgrading and expanding Tam That bridge
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Project implementation time
12 Month
Authority that issues the decision
ỦY BAN NHÂN DÂN XÃ MINH DIỆU
Approval date
19/11/2024
Approval ID
SỐ 273/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 6
1.Construction
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Bridge abutments: + Reinforced concrete pile foundation (25x25)cm, 8.4m long, 02 piles/abutment, straight. + Abutment body, abutment head wall: reinforced concrete, 1x2 stone concrete, M300, poured in place. - Bridge piers: + Reinforced concrete pile foundation (25x25)cm, 15.4m long (including 02 sections 8.4m and 7m), 02 piles/pillars, driven straight. + Pillar cap (cap beam): Reinforced concrete, 1x2 stone concrete, M300, poured in place. - Bridge bearing: Reinforced concrete, 1x2 stone concrete, M300, poured connected to the abutment body and pier cap. - Edge rhythm, middle rhythm: + Bridge deck: Reinforced concrete, 1x2 stone concrete, M300, 10 (cm) thick, poured in place combined with the main beam. + Wheel fender: TD (0.12x0.08)m; RC; 1x2 stone concrete, M300, poured in place and integrated with the bridge deck. + Longitudinal beams of 02 boundary spans (4 beams): reinforced concrete poured in place, TD (0.2x0.4)m; 4.1m long/beam; The longitudinal beams are fixed with horizontal beams 1,225 (m) long, with cross-section (0.15x0.30)m, reinforced concrete structure, 1x2 stone concrete, M300, poured in place. + Mid-span longitudinal beam (02 beams): Cast-in-place reinforced concrete, TD (0.20x0.40)m length 6m/beam, longitudinal beams are fixed with horizontal beams 1.225m long; with cross section (0.15x0.30)m, reinforced concrete structure, 1x2 stone concrete, M300, poured in place. + Railing post: TD (0.12x0.12)m, 0.8m high, reinforced concrete, 1x2 stone reinforced concrete, M250, poured in place and combined with wheel guard. + Handrail: TD (0.07x0.10)m, reinforced concrete, 1x2 stone reinforced concrete, M250, poured in place and combined with the handrail pillar. - Install bridge nameplates on both sides of the bridge. - Road leading to the bridge: Structure made of reinforced concrete (fi6@200 steel), 1x2 stone, M250, 4.2m wide, 16(cm) thick + Rubber lining sheet + CPDD layer 0x4 Type I (Dmax = 25mm), 15cm thick, compaction K>= 0.95 + Additional layer of black sand, average thickness (20 - 22)cm, compaction K>= 0.90 + Surface Current 4.2m wide concrete road. - Reinforced concrete embankment on both sides of bridge abutment: Reinforced concrete pile (20x20)cm, 8.4m long; Inside, install reinforced concrete panels (1200x600x80)mm to block the soil. Above the surface of the woven panels is a reinforced concrete anchor beam structure (280x200)mm connecting the revetment piles. (Other details according to the approved construction drawing design documents)
Capital source details
State budget capital (Economic source)
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòa Bình District, Cà Mau
Implementation location (Before merge)
Bac Lieu province
2.Project management consultancy
Tender/ Prequalification Notice ID
Contract execution period
12 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out project management from the commencement stage to completion and putting the project into use
Capital source details
State budget capital (Economic source)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòa Bình District, Cà Mau
Implementation location (Before merge)
Bac Lieu province
3.Consultancy on preparation and evaluation of tender documents
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out the work of preparing bidding documents and evaluating bid documents
Capital source details
State budget capital (Economic source)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòa Bình District, Cà Mau
Implementation location (Before merge)
Bac Lieu province
4.Consultancy on appraisal of tender documents and contractor selection
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Carry out appraisal of bidding documents and contractor selection results
Capital source details
State budget source (Economic source)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòa Bình District, Cà Mau
Implementation location (Before merge)
Bac Lieu province
5.Construction supervision consultant
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Participate in acceptance, confirmation of phase completion volume, or acceptance of project settlement volume
Capital source details
State budget capital (Economic source).
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòa Bình District, Cà Mau
Implementation location (Before merge)
Bac Lieu province
6.Independent audit
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Check the components of documents and legal documents for project implementation
Capital source details
Capital State budget source (Economic capital)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hòa Bình District, Cà Mau
Implementation location (Before merge)
Bac Lieu province

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan: Upgrading and expanding Tam Do bridge". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan: Upgrading and expanding Tam Do bridge" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 5

You did not use the site, Click here to remain logged. Timeout: 60 second