Bidder Selection Plan

Creating and upgrading fiber optic network for cutting, planning, optimizing and standardizing GPON optical access network in Telecommunications Center - Phase 1 in 2025

  Watching  
Project Contractor selection plan Bid award
Find: 16:13 02/07/2025
Contractor Selection Plan ID
PL2500165919-00
Publishing time
15:51 02/07/2025
Posting Status
Published
Contractor selection plan name
Creating and upgrading fiber optic network for cutting, planning, optimizing and standardizing GPON optical access network in Telecommunications Center - Phase 1 in 2025
Investment objective
Gradually renovate and upgrade the periphery of fiber optic cable to improve the quality of the network and service quality provided to customers; Maintain market share and expand the service area of ​​the BRC network, ensure the network capacity, ready to meet the needs of developing BRC subscribers in all areas in the telecommunications center of 2,3,5,6, Thuy Nguyen.
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500040718-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
30 Date
Authority that issues the decision
Viễn thông Hải Phòng
Approval date
26/06/2025
Approval ID
1431/QĐ-VNPT-HP-KTĐT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 2
1.Civil Works
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
+ Telecommunication Center 2: Construction of 12FO hanging fiber optic cable on the column route is 6,545m long; Installation, welding 40 Splitter 1: 4 in in the tray; 64 boxes of optical optical optical 1:16 out dg/APC; Install 70m of F61mm plastic pipes, 100m stainless steel belt, 50 stainless steel belt locks. + Telecommunication Center 3: Pulling 48FO cable cable in a 1,200m long sewer system; Out, pull the 24fo cable cable withdrawal in a 640m long sewer system, pull out 8FO cable cable with a 270m long sluice system; Installation, welding 19 sets of Splitter 1: 4 in the tray; 37 optical box Splitter 1:16 OUTG DC/APC; 01 ODF-48FO NEXANS tray, 01 box of OTB-48FO OUT DREP/APC plastic case, 02 boxes of OTB-24FO OUT DEL/APC, 02 boxes of OTB-12FO OUT DEL/APC installed 25m plastic tube F61mm, 42m stainless steel belt, 42 stainless steel locks. + Telecommunications center 5: Construction of 12FO hanging fiber optic cable on a 757m long column route; Installation, welding 16 sets of Splitter 1: 4 in in the tray; 39 optical boxes Splitter 1:16 OUT De De; Installing 40m of F61mm plastic pipes, 46m stainless steel belt, 46 stainless steel locks, 04 sets of 24FO bamboo shoots, 02 sets of 96FO bamboo shoots. + Telecommunications center 6: Pulling 12fo cable cable 12fo long 425m long; constructing 48FO hanging fiber optic cable on a 1,715m long column route; Construction of 12FO hanging fiber optic cable on a 3,767m long column route, construction of 4FO hanging fiber optic cable on a 1,045m long column route; Installation, welding 05 sets of Splitter 1: 4 in in the tray; 43 Splitter boxes 1:16 OUT DE; 02 boxes of OTB-12FO OUT DC/APC, 01 OTB-48FO set, 01 set of 48FO bamboo shoots, 01 set of 12fo bamboo shoots, 01 ODF-48FO NEXANS tray, installing 26m F61mm plastic pipe, 43m stainless steel belt, 43 stainless steel locks. + Thuy Nguyen Telecommunication Center: pulling the 48FO fiber optic cable line 120m long; construction of 24FO hanging fiber optic cable on a 1,238m long column route; Construction of 12FO hanging fiber optic cable on a 2,350m long column, installation, welding 05 Splitter 1: 4 in in the tray; 61 optical box Splitter 1:16 OUT DE; Install 37.2m plastic tube F61mm, 61m stainless steel belt, 61 stainless steel belt locks.
Capital source details
Fixed Assets
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Thuy Nguyen Ward, Hai Phong City
2.Audit
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Audit
Capital source details
Fixed Assets
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hai An Ward, Hai Phong City

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Creating and upgrading fiber optic network for cutting, planning, optimizing and standardizing GPON optical access network in Telecommunications Center - Phase 1 in 2025". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Creating and upgrading fiber optic network for cutting, planning, optimizing and standardizing GPON optical access network in Telecommunications Center - Phase 1 in 2025" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 12

You did not use the site, Click here to remain logged. Timeout: 60 second