Summary of main tasks of the bid package
+ Telecommunication Center 2: Construction of 12FO hanging fiber optic cable on the column route is 6,545m long; Installation, welding 40 Splitter 1: 4 in in the tray; 64 boxes of optical optical optical 1:16 out dg/APC; Install 70m of F61mm plastic pipes, 100m stainless steel belt, 50 stainless steel belt locks.
+ Telecommunication Center 3: Pulling 48FO cable cable in a 1,200m long sewer system; Out, pull the 24fo cable cable withdrawal in a 640m long sewer system, pull out 8FO cable cable with a 270m long sluice system; Installation, welding 19 sets of Splitter 1: 4 in the tray; 37 optical box Splitter 1:16 OUTG DC/APC; 01 ODF-48FO NEXANS tray, 01 box of OTB-48FO OUT DREP/APC plastic case, 02 boxes of OTB-24FO OUT DEL/APC, 02 boxes of OTB-12FO OUT DEL/APC installed 25m plastic tube F61mm, 42m stainless steel belt, 42 stainless steel locks.
+ Telecommunications center 5: Construction of 12FO hanging fiber optic cable on a 757m long column route; Installation, welding 16 sets of Splitter 1: 4 in in the tray; 39 optical boxes Splitter 1:16 OUT De De; Installing 40m of F61mm plastic pipes, 46m stainless steel belt, 46 stainless steel locks, 04 sets of 24FO bamboo shoots, 02 sets of 96FO bamboo shoots.
+ Telecommunications center 6: Pulling 12fo cable cable 12fo long 425m long; constructing 48FO hanging fiber optic cable on a 1,715m long column route; Construction of 12FO hanging fiber optic cable on a 3,767m long column route, construction of 4FO hanging fiber optic cable on a 1,045m long column route; Installation, welding 05 sets of Splitter 1: 4 in in the tray; 43 Splitter boxes 1:16 OUT DE; 02 boxes of OTB-12FO OUT DC/APC, 01 OTB-48FO set, 01 set of 48FO bamboo shoots, 01 set of 12fo bamboo shoots, 01 ODF-48FO NEXANS tray, installing 26m F61mm plastic pipe, 43m stainless steel belt, 43 stainless steel locks.
+ Thuy Nguyen Telecommunication Center: pulling the 48FO fiber optic cable line 120m long; construction of 24FO hanging fiber optic cable on a 1,238m long column route; Construction of 12FO hanging fiber optic cable on a 2,350m long column, installation, welding 05 Splitter 1: 4 in in the tray; 61 optical box Splitter 1:16 OUT DE; Install 37.2m plastic tube F61mm, 61m stainless steel belt, 61 stainless steel belt locks.