E-SCL18: Major repair in 2019. Category: Traffic Road - Son La Hydropower Plant. HM: Route NT1, NP4 and NP1.2. Item: Road surface drainage ditches and margins NT1; Abutment of Nam Pam bridge; 4.1/NP4 overflow; Rock trench for road construction NP1.2
E-SCL18: Major repair in 2019. Category: Traffic Road - Son La Hydropower Plant. HM: Route NT1, NP4 and NP1.2. Item: Road surface drainage ditches and margins NT1; Abutment of Nam Pam bridge; 4.1/NP4 overflow; Rock trench for road construction NP1.2
1.E-SCL18: Major repair in 2019. Category: Traffic Road - Son La Hydropower Plant. HM: Route NT1, NP4 and NP1.2. Item: Road surface drainage ditches and margins NT1; Abutment of Nam Pam bridge; Overflow 4.1 NP4; Rock trench for road construction NP1.2
Electricity production cost of Son La Hydropower Company in 2019
Contractor Selection Type
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2019
Contract Type
All in one
Prequalification
No
Location
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "E-SCL18: Major repair in 2019. Category: Traffic Road - Son La Hydropower Plant. HM: Route NT1, NP4 and NP1.2. Item: Road surface drainage ditches and margins NT1; Abutment of Nam Pam bridge; 4.1/NP4 overflow; Rock trench for road construction NP1.2". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "E-SCL18: Major repair in 2019. Category: Traffic Road - Son La Hydropower Plant. HM: Route NT1, NP4 and NP1.2. Item: Road surface drainage ditches and margins NT1; Abutment of Nam Pam bridge; 4.1/NP4 overflow; Rock trench for road construction NP1.2" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.