Bidder Selection Plan

Embankment to prevent landslides upstream and downstream of Bau Sa bridge and reinforcement of slopes to protect the roadside (drainage downstream) of Nguyen Luong Bang street from Hoang Van Company to Bau Sa bridge, Vinh Phuong commune

  Watching      
Find: 10:55 09/01/2024
Contractor Selection Plan ID
PL2400003295-00
Publishing time
15:44 08/01/2024
Posting Status
Published
Contractor selection plan name
Embankment to prevent landslides upstream and downstream of Bau Sa bridge and reinforcement of slopes to protect the roadside (drainage downstream) of Nguyen Luong Bang street from Hoang Van Company to Bau Sa bridge, Vinh Phuong commune
Investment objective
Build embankments to stabilize soil slopes and stream banks to prevent landslides for fields upstream and downstream of Bau Sa bridge, ensure drainage and stabilize flow during the rainy season and reinforce slopes to ensure structural integrity. curbs, road surfaces and traffic safety
Project management forms
The investor hires a project management consultant
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2400001007-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
2 Years
Location
Authority that issues the decision
UBND thành phố Nha Trang
Approval date
29/11/2023
Approval ID
17381/QĐ-CT-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 3
1.Cost of contractor selection
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
All in One
Prequalification
No
Location
Nha Trang City, Khánh Hòa
2.Construction supervision consultancy
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
city budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
All in One
Prequalification
No
Location
Nha Trang City, Khánh Hòa
3.Construction
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
city budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q1 2024
Type of contract
All in One
Prequalification
No
Location
Nha Trang City, Khánh Hòa

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Embankment to prevent landslides upstream and downstream of Bau Sa bridge and reinforcement of slopes to protect the roadside (drainage downstream) of Nguyen Luong Bang street from Hoang Van Company to Bau Sa bridge, Vinh Phuong commune". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Embankment to prevent landslides upstream and downstream of Bau Sa bridge and reinforcement of slopes to protect the roadside (drainage downstream) of Nguyen Luong Bang street from Hoang Van Company to Bau Sa bridge, Vinh Phuong commune" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 11

Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8534 Projects are waiting for contractors
  • 141 Tender notices posted in the last 24 hours
  • 160 Contractor selection plan posted in the last 24 hours
  • 23692 Tender notices posted in the past month
  • 37142 Contractor selection plan posted in the last month
Consultants are supporting you
You are not logged in.
To view information, please Login or Register if you do not have an account.
Signing up is simple and completely free.
You did not use the site, Click here to remain logged. Timeout: 60 second