Bidder Selection Plan

Improving the technological process to improve water quality at Tan Hiep Water Plant

  Watching      
Find: 09:27 12/02/2025
Contractor Selection Plan ID
PL2500001212-02
Publishing time
09:26 12/02/2025
Posting Status
Published
Contractor selection plan name
Improving the technological process to improve water quality at Tan Hiep Water Plant
Bid Solicitor
Investment objective
Improving technological processes to improve water quality at Tan Hiep Water Plant, with high treatment efficiency and ensuring backup coefficient for flow regulation, when the water treatment plant of Investment Joint Stock Company If Tan Hiep Water or Kenh Dong Water Plant has a problem and must stop supplying water, Tan Hiep Water Plant will operate at excess capacity to ensure safe water supply.
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500000235-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
72 Month
Authority that issues the decision
TỔNG CÔNG TY CẤP NƯỚC SÀI GÒN - TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN
Approval date
30/12/2024
Approval ID
2882/QĐ-TCT-KHĐT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Filter name, Investor, Highest bid price, Approval date, Publication date, Bidding package information (View changes)

- Change: Filter name, Publication date, Bidding package information (View changes)

- Change: Total investment, total investment, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 8
1.Consultancy on preparation and evaluation of tender documents
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare and Evaluate Tender documents
Capital source details
Business capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hóc Môn District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ho Chi Minh city
2.Consulting on appraisal of bidding documents, appraisal of contractor selection results
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Evaluation of bidding documents, evaluation of contractor selection results
Capital source details
Business capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hóc Môn District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ho Chi Minh city
3.Consultancy on designing construction drawings and making construction cost estimates
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Design construction drawings and make construction cost estimates
Capital source details
Business capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hóc Môn District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ho Chi Minh city
4.Consultancy and verification of construction drawing design and construction cost estimate
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verification of construction drawing design and construction cost estimate
Capital source details
Business capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hóc Môn District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ho Chi Minh city
5.Providing equipment, materials and construction works
Tender/ Prequalification Notice ID
Contract execution period
540 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Providing equipment, materials and construction works
Capital source details
Business capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Second quarter, 2026
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Hóc Môn District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ho Chi Minh city
6.Construction supervision consultancy and construction equipment installation
Tender/ Prequalification Notice ID
Contract execution period
540 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervision of construction and installation of construction equipment
Capital source details
Business capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hóc Môn District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ho Chi Minh city
7.Construction insurance
Tender/ Prequalification Notice ID
Contract execution period
1270 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction insurance
Capital source details
Business capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hóc Môn District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ho Chi Minh city
8.Construction audit
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction audit
Capital source details
Business capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Second quarter, 2027
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hóc Môn District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ho Chi Minh city

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Improving the technological process to improve water quality at Tan Hiep Water Plant". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Improving the technological process to improve water quality at Tan Hiep Water Plant" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 20

You did not use the site, Click here to remain logged. Timeout: 60 second