Inland waterway coal transportation service for consumption from Ocean Port to Unloading Port of Nghi Son 1 Thermal Power Plant (Implementation of VTCC's coal processing and trading plan in 2021)
Inland waterway coal transportation service for consumption from Ocean Port to Unloading Port of Nghi Son 1 Thermal Power Plant (Implementation of VTCC's coal processing and trading plan in 2021)
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
Quyet dinh so 215 ve viec phe duyet DT va KHLCNT goi thau so 05.2021 1.PDF
Related announcements
- Change:Notification form, Publication date (View changes)
Bidding widely, domestically, without prequalification, without online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2021
Contract Type
According to fixed unit price
Prequalification
No
Location
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Inland waterway coal transportation service for consumption from Ocean Port to Unloading Port of Nghi Son 1 Thermal Power Plant (Implementation of VTCC's coal processing and trading plan in 2021)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Inland waterway coal transportation service for consumption from Ocean Port to Unloading Port of Nghi Son 1 Thermal Power Plant (Implementation of VTCC's coal processing and trading plan in 2021)" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.