Installing additional makeup water lines from unit 2 for the chiller system and cleaning the heat exchanger blocks of the rotary air dryer (GAH) of Vung Ang 1 Thermal Power Plant
Installing additional makeup water lines from unit 2 for the chiller system and cleaning the heat exchanger blocks of the rotary air dryer (GAH) of Vung Ang 1 Thermal Power Plant
Installing additional makeup water lines from unit 2 for the chiller system and cleaning the heat exchanger blocks of the rotary air dryer (GAH) of Vung Ang 1 Thermal Power Plant
CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC DẦU KHÍ VIỆT NAM - CÔNG TY CỔ PHẦN - CÔNG TY ĐIỆN LỰC DẦU KHÍ HÀ TĨNH
Approval date
23/10/2023
Approval ID
1745/QĐ-ĐLDKHT-KHVT
Approval Documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
QĐ PDKHLCNT số 1745, ngày 23 tháng 10 năm 2023.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Installing additional makeup water lines from unit 2 for the chiller system and cleaning the heat exchanger blocks of the rotary air dryer (GAH) of Vung Ang 1 Thermal Power Plant
Production and business in 2023 of PV Power Ha Tinh
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2023
Type of contract
All in One
Prequalification
No
Location
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Installing additional makeup water lines from unit 2 for the chiller system and cleaning the heat exchanger blocks of the rotary air dryer (GAH) of Vung Ang 1 Thermal Power Plant". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Installing additional makeup water lines from unit 2 for the chiller system and cleaning the heat exchanger blocks of the rotary air dryer (GAH) of Vung Ang 1 Thermal Power Plant" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.