Bidder Selection Plan

Installing an elevator at the lecture h lecture B Thu Duc base

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 21:30 01/01/2026
Contractor Selection Plan ID
PL2500181188-01
Publishing time
21:29 01/01/2026
Posting Status
Published
Contractor selection plan name
Installing an elevator at the lecture h lecture B Thu Duc base
Procurement name
Installing an elevator at the lecture h lecture B Thu Duc base
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Shopping budget
To view full information, please Login or Register
Spending Category
Mandatory spending
Authority that issues the decision
Trường Đại học ngân Hàng Tp. Hồ Chí Minh
Approval date
30/12/2025
Approval ID
5097/QĐ-ĐHNH
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Investor, Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 2
1.Civil Works
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Removing the stairs wall system. - Shave old wall paint outside the house. - Shave wall paint in the house. - Digging foundation, building foundation. - Transporting the work. - Pour concrete foundation. - Tailed tape stops. - Producing, installing and removing nail formwork. - Producing and installing formwork. - Installation of reinforced foundations. - Processing and installing reinforced beams and beams. - Building walls. - Wall inside the house. - Painted inside outside. - Supplying and installing tempered glass. - Supply and install Alu. - Supply and install granite. - Supply and install aluminum doors. - Provide elevator equipment - Installation of elevators
Capital source details
Fund development fund
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
2.Construction supervision consultant
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Construction supervision consultancy - Monitoring and installing equipment
Capital source details
Fund development fund
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Installing an elevator at the lecture h lecture B Thu Duc base". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Installing an elevator at the lecture h lecture B Thu Duc base" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 1

You did not use the site, Click here to remain logged. Timeout: 60 second