Bidder Selection Plan

Investing in replacement elevator at Star 2000 radar station

  Watching      
Find: 14:49 26/05/2025
Contractor Selection Plan ID
PL2500128316-00
Publishing time
14:49 26/05/2025
Posting Status
Published
Contractor selection plan name
Investing in replacement elevator at Star 2000 radar station
Investment objective
Investing and replacing elevators at the Star 2000 radar station to ensure the movement is convenient and safe for users to meet the travel needs of the staff operating and checking and repairing the Star 2000 radar system during the operation process and contributing to improving the comfort of the infrastructure in the Tan Son Nhat radar station area
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500032315-01
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group C
Project implementation time
180 Date
Authority that issues the decision
Công ty Quản lý bay miền Nam
Approval date
23/05/2025
Approval ID
Số 293/QĐ-QLBMN
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 2
1.Supervision of elevator installation at Radar Star 2000
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervise the construction of elevators and materials and equipment
Capital source details
Capital of Vietnam Flight Management Corporation
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Tân Bình District, TP.Hồ Chí Minh
Implementation location (Before merge)
TP. Hồ Chí Minh
2.Supply and install elevators at Star 2000 radar station
Tender/ Prequalification Notice ID
Contract execution period
180 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supply, construction and installation of elevators and supplies and equipment
Capital source details
Capital of Vietnam Flight Management Corporation
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Tân Bình District, TP.Hồ Chí Minh
Implementation location (Before merge)
TP. Hồ Chí Minh

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Investing in replacement elevator at Star 2000 radar station". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Investing in replacement elevator at Star 2000 radar station" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 5

You did not use the site, Click here to remain logged. Timeout: 60 second