Concretize the expected investment contents of Hanoi water drainage planning and S4 subdivision planning in the current area with polluted wastewater sources; Building synchronous wastewater treatment systems for Phu Luong basin wards, including: Main sewer network, overflow wells, sewer routes, centralized wastewater treatment stations as a basis for building a completely separate sewage system; Investing in advanced and modern technology to ensure collection wastewater is handled up to the requirements before discharging into the lips
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register
KHLCNT Kiến Hưng.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements
- Change:Approval date, Publication date, Bidding package information (View changes)
4.Package 11: Consulting on evaluation of Bidding Documents, HSYC and contractor selection results in the project implementation phase (except for the auditing package)
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Investment project to build collection system and Kien Hung wastewater treatment plant, Ha Dong district, Hanoi city". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Investment project to build collection system and Kien Hung wastewater treatment plant, Ha Dong district, Hanoi city" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.