Items for treatment of sedimentation in the riverbed downstream of the discharge channel and items for reinforcement of the condenser slot on the right shoulder of the dam, Dong Nai 5 hydropower plant
Items for treatment of sedimentation in the riverbed downstream of the discharge channel and items for reinforcement of the condenser slot on the right shoulder of the dam, Dong Nai 5 hydropower plant
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
279-QD-DN5.rar
List of Bid:
Number of packages: 2
1.Package 2: Construction and reinforcement of the condenser slot on the right shoulder of the Dong Nai Hydropower Plant 5
Bidding widely, domestically, without prequalification, without online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q2 2020
Contract Type
All in one
Prequalification
No
Location
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Items for treatment of sedimentation in the riverbed downstream of the discharge channel and items for reinforcement of the condenser slot on the right shoulder of the dam, Dong Nai 5 hydropower plant". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Items for treatment of sedimentation in the riverbed downstream of the discharge channel and items for reinforcement of the condenser slot on the right shoulder of the dam, Dong Nai 5 hydropower plant" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.