Investing in the construction of Tan Nam international border gate to improve operational efficiency for management and control of the border gate area.
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
873-QĐ PD KHLCNT.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 18
1.Construction of Border Guard Control Station (including leveling)
The Central budget (2021-2025 period is balanced at 130,000 million VND), the rest is balanced with provincial budget capital and other legal capital sources.
The Central budget (2021-2025 period is balanced at 130,000 million VND), the rest is balanced with provincial budget capital and other legal capital sources.
The Central budget (2021-2025 period is balanced at 130,000 million VND), the rest is balanced with provincial budget capital and other legal capital sources.
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Contract Type
Fixed unit price
Prequalification
No
Location
Tan Bien District, Tay Ninh Province
Bidding method
Online
4.Construction of the main road through the border gate (including ensuring traffic safety during construction); technical infrastructure works; leveling (entire main road); Set up demarcation markers
The Central budget (2021-2025 period is balanced at 130,000 million VND), the rest is balanced with provincial budget capital and other legal capital sources.
The Central budget (2021-2025 period is balanced at 130,000 million VND), the rest is balanced with provincial budget capital and other legal capital sources.
Contractor Selection Type
Competitive Offer
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Contract Type
All in One
Prequalification
No
Location
Tan Bien District, Tay Ninh Province
Bidding method
Online
6.Construction of low voltage power supply system and peripheral lighting; Medium voltage power supply system and transformer station
The Central budget (2021-2025 period is balanced at 130,000 million VND), the rest is balanced with provincial budget capital and other legal capital sources.
The Central budget (2021-2025 period is balanced at 130,000 million VND), the rest is balanced with provincial budget capital and other legal capital sources.
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Contract Type
All in One
Prequalification
No
Location
Tan Bien District, Tay Ninh Province
Bidding method
Directly
8.Supply and installation of equipment (office, specialized to serve activities at the border gate)
The Central budget (2021-2025 period is balanced at 130,000 million VND), the rest is balanced with provincial budget capital and other legal capital sources.
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Contract Type
All in One
Prequalification
No
Location
Tan Bien District, Tay Ninh Province
Bidding method
Online
9.Topographical survey step of construction drawing design
The Central budget (2021-2025 period is balanced at 130,000 million VND), the rest is balanced with provincial budget capital and other legal capital sources.
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Contract Type
All in One
Prequalification
No
Location
Tan Bien District, Tay Ninh Province
Bidding method
Directly
10.Prepare construction drawing design and construction cost estimate
The Central budget (2021-2025 period is balanced at 130,000 million VND), the rest is balanced with provincial budget capital and other legal capital sources.
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Contract Type
All in One
Prequalification
No
Location
Tan Bien District, Tay Ninh Province
Bidding method
Online
11.Verification of construction drawing design and construction estimate
The Central budget (2021-2025 period is balanced at 130,000 million VND), the rest is balanced with provincial budget capital and other legal capital sources.
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Contract Type
All in One
Prequalification
No
Location
Tan Bien District, Tay Ninh Province
Bidding method
Directly
12.Survey, make construction technical plan and estimate the clearance of mines and explosives
The Central budget (2021-2025 period is balanced at 130,000 million VND), the rest is balanced with provincial budget capital and other legal capital sources.
The Central budget (2021-2025 period is balanced at 130,000 million VND), the rest is balanced with provincial budget capital and other legal capital sources.
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Contract Type
All in One
Prequalification
No
Location
Tan Bien District, Tay Ninh Province
Bidding method
Directly
14.Traffic safety inspection (stage before acceptance and handover to put the project into operation)
The Central budget (2021-2025 period is balanced at 130,000 million VND), the rest is balanced with provincial budget capital and other legal capital sources.
The Central budget (2021-2025 period is balanced at 130,000 million VND), the rest is balanced with provincial budget capital and other legal capital sources.
The Central budget (2021-2025 period is balanced at 130,000 million VND), the rest is balanced with provincial budget capital and other legal capital sources.
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Quarter I, 2025
Contract Type
All in One
Prequalification
No
Location
Tan Bien District, Tay Ninh Province
Bidding method
Online
17.Supervision of construction of Fire Protection System
The Central budget (2021-2025 period is balanced at 130,000 million VND), the rest is balanced with provincial budget capital and other legal capital sources.
The Central budget (2021-2025 period is balanced at 130,000 million VND), the rest is balanced with provincial budget capital and other legal capital sources.
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Contract Type
By percentage
Prequalification
No
Location
Tan Bien District, Tay Ninh Province
Bidding method
Directly
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "KHLCNT Construction of Tan Nam international border gate". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "KHLCNT Construction of Tan Nam international border gate" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.