Bidder Selection Plan

Kim Long - Binh Ba Street, Chau Duc District

  Watching      
Find: 18:43 13/05/2025
Contractor Selection Plan ID
PL2500113220-00
Publishing time
18:12 13/05/2025
Posting Status
Published
Contractor selection plan name
Kim Long - Binh Ba Street, Chau Duc District
Project management forms
The investor directly manages the project
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500028639-01
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
36 Month
Authority that issues the decision
Ủy ban nhân dân huyện Châu Đức
Approval date
13/05/2025
Approval ID
3470/QĐ-UBND ngày 13/5/2025 của UBND huyện Châu Đức
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Highest bid price, Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Investor, Lowest bid price, Highest bid price, Decision-making agency, Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Lowest bid price, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 28
1.Consultancy on topographic survey of BVTC
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consultancy on topographic survey of BVTC
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
2.Consulting on making topographic survey tasks
Tender/ Prequalification Notice ID
Contract execution period
5 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on making topographic survey tasks
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
3.Consulting supervision surveying terrain steps
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting supervision surveying terrain steps
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
4.Consulting on geological surveying steps to prepare the design of physical protection
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on geological surveying steps to prepare the design of physical protection
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
5.Consulting fees for geological survey tasks
Tender/ Prequalification Notice ID
Contract execution period
5 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting fees for geological survey tasks
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
6.Advice on geological survey and supervision.
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Advice on geological survey and supervision.
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
7.Consulting on construction design and design of BIM model after basic design
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction design consulting and implementation after basic design
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
8.Consultancy on verification of construction design and deploying after basic design
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consultancy on verification of construction design and deploying after basic design
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
9.Consultancy for verification of construction estimates
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consultancy for verification of construction estimates
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
10.Traffic safety verification consultancy for construction design after basic design
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Traffic safety verification consultancy for construction design after basic design
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
11.Traffic safety inspection consultation before acceptance and put into use
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Traffic safety inspection consultation before acceptance and put into use
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
12.Construction supervision consultancy
Tender/ Prequalification Notice ID
Contract execution period
36 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction supervision consultancy
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
13.Consulting to make bids and evaluate construction bids
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting to make bids and evaluate construction bids
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
14.Consulting to make bids and evaluate bidding documents for construction supervision
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting to make bids and evaluate bidding documents for construction supervision
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
15.Advice on making bids and evaluation of bidding documents for construction drawing drawing
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Advice on making bids and evaluation of bidding documents for construction drawing drawing
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
16.Advice on making bids and evaluation of audit bids
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Advice on making bids and evaluation of audit bids
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
17.Consultancy and appraisal of bidding documents for construction bidding packages
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consultancy and appraisal of bidding documents for construction bidding packages
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
18.Consultancy on appraisal of results of contractor selection for construction bidding packages
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consultancy on appraisal of results of contractor selection for construction bidding packages
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
19.Consulting on appraisal of bidding documents and appraisal of contractor selection results for construction supervision consulting packages
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on appraisal of bidding documents and appraisal of contractor selection results for construction supervision consulting packages
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
20.Consulting on appraising bidding documents and evaluating the results of selection of contractors for construction design consultancy package deployed after basic design
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on appraising bidding documents and evaluating the results of selection of contractors for construction design consultancy package deployed after basic design
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
21.Consulting to appraise the bidding documents and appraise the results of the contractor selection of the audit consultancy package
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting to appraise the bidding documents and appraise the results of the contractor selection of the audit consultancy package
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
22.Construction insurance
Tender/ Prequalification Notice ID
Contract execution period
48 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction insurance
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
23.Auditing and settlement consulting
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Auditing and settlement consulting
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Third quarter, 2026
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
24.Consulting quality accreditation, construction works
Tender/ Prequalification Notice ID
Contract execution period
36 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting quality accreditation, construction works
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
25.Geodetic surveying and mapping
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Geodetic surveying and mapping
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
26.Consulting on clearing mines and explosives
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on clearing mines and explosives
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
27.Consultancy on appraisal of material prices
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consultancy on appraisal of material prices
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province
28.Civil Works
Tender/ Prequalification Notice ID
Contract execution period
36 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction
Capital source details
Targeted supplementary provincial budget for district budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Châu Đức District, TP.Hồ Chí Minh
Implementation location (Before merge)
Ba Ria Vung Tau province

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Kim Long - Binh Ba Street, Chau Duc District". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Kim Long - Binh Ba Street, Chau Duc District" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 6

You did not use the site, Click here to remain logged. Timeout: 60 second