Bidder Selection Plan

LCCT in project preparation stage

  Watching  
Project Contractor selection plan Bid award
Find: 11:23 08/09/2022
Contractor selection plan ID
20220916437-00
Publication date
11:15 08/09/2022
Publication status
Actual notification
Contractor selection plan name
LCCT in project preparation stage
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
20220916419-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Project
QD status
There has been a decision to approve the investment project
Approval date
08/09/2022
Approval ID
1723/QĐ-EVN SPC
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

List of Bid:
Number of packages: 3
1.Package 01: Consultancy Survey, survey, collect data and prepare F/S for Construction Investment Project to increase capacity of transformer T2-25MVA to T2 – 40MVA Duc Trong 110kV substation
Tender/ Prequalification Notice ID
Contract Period
200 days
Domestic/ International
International
Bidding method
Directly
Fields
Advise
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
KHCB and commercial loans
Contractor Selection Type
Do it yourself, domestically, without pre-qualification, not online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2022
Contract Type
All in one
Prequalification
No
Implementation location
2.Package 02: Consulting, verifying the construction investment feasibility study report and verifying the construction design, deploying after the basic design Project to increase the capacity of T2-25MVA transformer to T2 – 40MVA Duc Trong 110kV substation
Tender/ Prequalification Notice ID
Contract Period
200 days
Domestic/ International
International
Bidding method
Directly
Fields
Advise
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
KHCB and commercial loans
Contractor Selection Type
Short appointment of contractors, no pre-qualification domestically, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2022
Contract Type
All in one
Prequalification
No
Implementation location
3.Package 03: Construction survey supervision in the construction investment and technical report phase
Tender/ Prequalification Notice ID
Contract Period
60 days
Domestic/ International
International
Bidding method
Directly
Fields
Advise
Regulatory compliance
Tender value
To view full information, please Login or Register
Funding source
KHCB and commercial loans
Contractor Selection Type
Do it yourself, domestically, without pre-qualification, not online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2022
Contract Type
All in one
Prequalification
No
Implementation location

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "LCCT in project preparation stage". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "LCCT in project preparation stage" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.
Views: 26

You did not use the site, Click here to remain logged. Timeout: 60 second