Bidder Selection Plan

Le Ngoc Long Street Project (paragraph 2)

  Watching  
Project Contractor selection plan Bid award
Find: 08:17 02/04/2025
Contractor Selection Plan ID
PL2500066761-00
Publishing time
08:16 02/04/2025
Posting Status
Published
Contractor selection plan name
Le Ngoc Long Street Project (paragraph 2)
Bid Solicitor
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Spending Category
Investment and Development Spending
Authority that issues the decision
UBND huyện Gò Công Đông
Approval date
25/03/2025
Approval ID
134/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 3
1.Civil Works
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of construction items: The foundation, road surface: The total design length is 285.8m including: 197.3m main route and 88.5m branch route. Sugar width: 2.5m; Roads: 0.25m/side; BN BN = 3.0m. Sugar structure: Bounded road surface of 1x2 label 250, 120mm thick + Cut the surface of the road + plastic panels + reinforce the background with sand + sidewalks of meat soil. Traffic signs, road names and 12 piles. The sewer through the road: The passing through the reinforced concrete road D800mm + The pillow of the cajuput piles l = 4.7m + Reinforcing the two sides of the sewer with Melaleuca poles l = 4.7m + Arranging 06 reinforced concrete piles.
Capital source details
Public investment capital in 2025 (investment capital for development of central budget sources implementing the national target program on new rural construction)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Implementation location
Gò Công Đông District, Province Tiền Giang
Implementation location (After merge)
Prequalification
No
2.Construction technical supervision
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction technical supervision
Capital source details
Public investment capital in 2025 (investment capital for development of central budget sources implementing the national target program on new rural construction)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Implementation location
Gò Công Đông District, Province Tiền Giang
Implementation location (After merge)
Prequalification
No
3.Construction insurance
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction risk insurance
Capital source details
Public investment capital in 2025 (investment capital for development of central budget sources implementing the national target program on new rural construction)
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2025
Type of contract
All in One
Implementation location
Gò Công Đông District, Province Tiền Giang
Implementation location (After merge)
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Le Ngoc Long Street Project (paragraph 2)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Le Ngoc Long Street Project (paragraph 2)" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 12