1.Category: Repair and treatment of rusted column bars of gate columns and beams operated in 1994 - Ha Tinh 500kV transformer station;
2.Category: Repair and replacement of AT2 MBA online oil house - 500kV Ha Tinh transformer station;
3.Category: Repair and replacement of lightning protection wires 571, 574, 580, 582, AT2 - 500kV Ha Tinh transformer station;
4.Category: Ground repair of busbar area C51, TBD504, feeder 574 - 500kV Vung Ang transformer station.
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
QD KHLCNT dieu chinh goi 09HH.SCL2024.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
1.Package 08.XL.SCL2024: Supply of materials and construction, repair and treatment of rusted columns, gate columns and beams - Ha Tinh 500kV transformer station
3.Package 10.HH.SCL2024: Supply of materials and construction of Repair and replacement of lightning arrester wires 571, 574, 580, 582, AT2 - 500kV Ha Tinh substation
4.Package 11.XL.SCL2024: Supply of materials and construction and site repair of busbar area C51, TBD504, feeder 574 - Vung Ang 500kV transformer station
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Major repair plan for 2024 phase 3 - Ha Tinh power transmission". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Major repair plan for 2024 phase 3 - Ha Tinh power transmission" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.