Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
QD PDKHLCNT SCL 2020.rar
Related announcements
- Change:Notification form, Publication date (View changes)
Bidding widely, domestically, without prequalification, online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2019
Contract Type
All in one
Prequalification
No
Location
2.Tender package No 02.TCXD SCL 2020 Overhauling works : Overhauling cables to the meter boxes of low voltage areas of substations in 2020 team 2.8.Overhauling cables to the meter boxes of low voltage areas of substations pressure team 5.6. Overhaul and repair storage room and office of Hai Ba Trung Power Company.
Self-implementation, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2019
Contract Type
All in one
Prequalification
No
Location
4.Tender package No 04.TCXD SCL /2020: Construction of overhaul of cables in the meter boxes of low voltage areas of substations of management team 3 and 4.
Self-implementation, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2019
Contract Type
All in one
Prequalification
No
Location
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Major repair plan project in 2020". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Major repair plan project in 2020" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.