Bidder Selection Plan

Mobile communication network infrastructure construction projects in 2024

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 09:00 09/11/2024
Contractor Selection Plan ID
PL2400265423-00
Publishing time
08:59 09/11/2024
Posting Status
Published
Contractor selection plan name
Mobile communication network infrastructure construction projects in 2024
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Spending Category
Investment and Development Spending
Authority that issues the decision
VIỄN THÔNG HƯNG YÊN TẬP ĐOÀN BƯU CHÍNH VIỄN THÔNG VIỆT NAM
Approval date
28/10/2024
Approval ID
Số: 1048/QĐ-VNPT HYN-KTĐT
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Audit
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
General content for 22 projects: The monophone antenna column is 30m high, designed with steel with many segments connected together, segment 1 is equipped with an equipment mounting bracket, and is hot-dip galvanized. Construction of column foundation system with reinforced concrete; Reinforced with reinforced concrete piles; The grounding system for the antenna mast and station is made of fi42x2 copper pipes, linked together by a 40x4 hook; 30x3, M95 ground wire; 12fo suspended fiber optic cable transmits to the station; Twisted aluminum AC power cable; ODF type 12fo; along with other materials to carry out the project (For displacement projects, there is also the work of recovering old columns)
Capital source details
Depreciation of fixed assets
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
November 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Hưng yên City, Hưng Yên
Implementation location (Before merge)
Hung Yen province

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Mobile communication network infrastructure construction projects in 2024". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Mobile communication network infrastructure construction projects in 2024" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 5

You did not use the site, Click here to remain logged. Timeout: 60 second