New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, traction transmission for SmallCell and RRU stations in 52 provinces/city
New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, traction transmission for SmallCell and RRU stations in 52 provinces/city
1.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Dien Bien
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
2.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Lai Chau
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
3.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Lao Cai
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
4.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Son La
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
5.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, traction transmission for SmallCell and RRU stations in Yen Bai
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
6.New construction of antenna masts, substations, earthing, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Ha Giang
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
7.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, traction transmission for SmallCell and RRU stations in Tuyen Quang
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
8.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Bac Kan
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
9.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, traction transmission for SmallCell and RRU stations in Cao Bang
Short competitive offer, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
10.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Thai Nguyen
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
11.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary and transmission lines for SmallCell and RRU stations in Bac Giang
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
12.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Bac Ninh
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
13.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Lang Son
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
14.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary and transmission lines for SmallCell and RRU stations in Hung Yen
Short competitive offer, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
15.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Hai Duong
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
16.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, traction transmission for SmallCell and RRU stations in Hanoi
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
17.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary and transmission lines for SmallCell and RRU stations in Vinh Phuc
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
18.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, traction transmission for SmallCell and RRU stations in Phu Tho
Short competitive offer, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
19.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Hoa Binh
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
20.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, traction transmission for SmallCell and RRU stations in Hai Phong
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
21.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Quang Ninh
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
22.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary and transmission lines for SmallCell and RRU stations in Ha Nam
Short competitive offer, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
23.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Thai Binh
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
24.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Nam Dinh
Short competitive offer, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
25.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Ninh Binh
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
26.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Thanh Hoa
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
27.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary and transmission traction for SmallCell and RRU stations in Nghe An
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
28.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, traction transmission for SmallCell and RRU stations in Quang Binh
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
29.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Ha Tinh
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
30.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Quang Tri
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
31.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary and transmission lines for SmallCell and RRU stations in Thua Thien Hue
Short competitive offer, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
32.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary and transmission lines for SmallCell and RRU stations in Da Nang
Short competitive offer, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
33.New construction of antenna poles, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, traction transmission for SmallCell and RRU stations in Quang Ngai
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
34.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Binh Dinh
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
35.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Quang Nam
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
36.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Phu Yen
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
37.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Khanh Hoa
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
38.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Binh Thuan
Short competitive offer, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
39.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, traction transmission for SmallCell and RRU stations in Kon Tum
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
40.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Gia Lai
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
41.New construction of antenna poles, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, traction transmission for SmallCell and RRU stations in Dak Lak
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
42.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Lam Dong
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
43.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Binh Phuoc
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
44.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, traction transmission for SmallCell and RRU stations in Dong Nai
Short competitive offer, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
45.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Tay Ninh
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
46.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary and transmission traction for SmallCell and RRU stations in Binh Duong
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
47.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Ho Chi Minh
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
48.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Long An
Short competitive offer, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
49.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Ben Tre
Short competitive offer, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
50.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Tra Vinh
Short competitive offer, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
51.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, transmission traction for SmallCell and RRU stations in Hau Giang
Short competitive offer, domestic, no pre-qualification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
52.New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, traction transmission for SmallCell and RRU stations in Kien Giang
Competitive offers, domestic, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2018
Contract Type
All in one
Prequalification
No
Location
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, traction transmission for SmallCell and RRU stations in 52 provinces/city". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "New construction of antenna masts, substations, grounding, traction, installation of 2G, 3G, 4G equipment, auxiliary, traction transmission for SmallCell and RRU stations in 52 provinces/city" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.